Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
How is a contract review/handover conducted, and do you document it? (MRF for internal, Po acknowledgement <br>For external) OP008 section 6
-
What is documentation that captures manufacturing needs? (Engineering drawing, MRF, or quality plan) op008 section 7
-
Show me an example of a works order? (Route card) op008 section 7
-
Demonstrate that material procurement is meeting the required quality standard (material certs, po request) op008 section 8
-
Demonstrate that special/unusual tooling requirements are captured (notes on drawing) op008 section 8
-
Demonstrate component release for manufacture/assembly (suitable control) op008 section 9
-
Demonstrate that manufacture takes place in accordance with the works order (signed works order) op008 section 10
-
Demonstrate how anomalies/deficiencies/errors are identified and controlled (TQ for external, suitable control for internal) op008 section 10
-
Provide evidence to show that the inspection stages have been completed in accordance with the route card (signed route card) op008 section 11
-
Demonstrate compliance of op008 stage 11 to iso9001:2015 8.2.3.1e
-
Show evidence of a concession being granted (inspection record signed by engineer) op008 section 11
-
Demonstrate that inspection staff are SQEP'ed (training records) op008 section 11
-
Show how trends are being recorded (KPI's?) op008 section 11
-
How is the works order closed out? (EFACS report/process control) op008 section 12
-
Show evidence of review of completed scheme of works (suitable evaluation and communication) op008 section 13
-
Demonstrate compliance of op008 stage 14 to iso9001:2015 8.1b1