Information

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

General Safety

Site Conditions

  • Housekeeping in good condition?

  • Working areas and walkways clear of obstructions?

  • Nails removed from lumber or lumber material cleaned up?

  • Work area access controlled?

  • Fire extinguishers inspected and in good condition?

Work Conditions

  • Adequate amenities (toilets, wash areas, lunch rooms, etc)?

  • Sufficient lighting?

  • Adequate housekeeping?

  • Adequate noise/vibration control?

Daily Documentation

Daily Documentation

  • JSA/JHA complete for task?

  • Whole crew performing work signed off on JSA/JHA?

  • All hazards have been identified?

  • All hazards have a control method/procedure?

  • Is the control method/procedure being properly followed?

Incident Report

  • Any injury, near-hit, damage, or theft has been documented in writing and kept on-site for the duration of the project?

Site Documents

Site Specific Documentation

  • Adequate Site Safety Plan?

  • Orientation for workers, contractors, visitors?

Emergency Action Plan

  • Emergency plans for site?

  • Emergency procedures displayed and in place?

  • Training and rehearsal of emergency plans implemented?

  • Adequate first aid kits aid equipment for site?

  • Access to formally trained First Aiders on site or available through local channels?

  • Suitable or adequate communication equipment?

Training

Training Requirements

  • All employees have received orientation?

  • Workers have been trained to use hand tools?

  • Workers have been trained in accordance with scope of work and the associated hazards?

  • Workers have been trained on operation of motorized equipment?

Chemicals

Compressed Gas Cylinders

  • Cylinders secured? (with proper material)

  • Protective cap fastened?

  • Incompatible cylinders separated (oxygen / fuel)?

Hazardous Chemical Storage / Usage

  • Proper containers being used?

  • Containers properly labeled?

  • Safety Data Sheets for chemicals brought on site?

  • Reactivity labels on container?

  • Chemical dispensing (bonding, grounding and containment) requirements?

  • Proper storage location? (e.g. flammables near ignition sources, spills could enter stormwater drains, etc)

  • Incompatible chemicals stored near each other?

  • Aadequate spill containment equipment?

  • Excessive quantities stored on site or in vehicles?

  • Proper PPE?

Hot Work

Hot Work

  • Hot work permit?

  • Is there fire hazards in the area (flammable or combustible materials)?

  • Fire watch needed or present?

  • Welding leads and gas hoses in good condition?

  • Welding screen in place?

  • Fire extinguishers or other fire extinguishment media present?

  • Do crews have a way to report fires?

Electrical

Electrical Safety and Hazards

  • Lockout/Tagout performed properly?

  • Electrical equipment/extension cords in good condition? (damaged, out of test date or untested)

  • Grounding GFCI protection policy in place and being used?

  • Leads placed on ground or on metal structures?

  • Outlets being overloaded?

  • Electrical equipment near water?

  • Is Electrical equipment near flammables?

Hand Tools

Hand Tools

  • Are hand tools in good condition?

  • Are they being used safely?

  • Are guards in place?

  • Are cords in good condition?

  • Is proper PPE being used?

PPE

Personal Protective Equipment (PPE)

  • 2.1. Use of safety glasses?

  • 2.2. Use of face shields?

  • 2.3. Proper footwear?

  • 2.4. Hand and or arm protection? (Please specify)

  • 2.5. Hard hat?

  • 2.6. Respiratory protection?

  • 2.7. Hearing protection?

  • 2.8. Is there a lack of, or inadequate PPE (including sun protection)

  • 2.9. Other please fill in.

Motorized Equipment

Motorized Equipment (fork truck, cranes, etc)

  • Equipment in good working condition?

  • Back up alarms working?

  • Crane reports complete?

  • Daily inspections completed?

  • Operators trained on all pieces of equipment they are operating?

  • Safe work/operating procedures being followed?

  • Seat belts worn?

Rigging

Rigging

  • Tears, cuts, abrasions, or exposed core yarns present?

  • Legible and present tags?

  • Tell Tails (twin-path) visible?

  • Bird caging/crushing/broken wires present?

  • Corrosion present?

  • Bent/twisted/stretched links?

  • Maintenance, testing and inspection?

  • Qualified riggers being used?

Excavation and Trench

Excavations

  • Location of underground utilities identified?

  • Soil classification selected?

  • The soil has to be classified before work begins. This is done to choose the correct protection system to put in place.

  • Dig safe called 72hrs before excavation?

  • Appropriate sloping and or shoring?

  • Type C soil requires a 34 degree slope
    Type B soil requires a 45 degree slope
    Type A soil (rock) requires a 63 degree slope

  • Spoil pile has a 2 foot minimum distance form excavation wall?

  • Means of entry and or egress every 25ft?

  • Competent person? Clearly defined?

  • Work area access controlled?

  • Control of hazardous conditions (air toxics)?

Confined Space

Confined Space

  • Permit required confined space?

  • Air monitor meets the scope of work requirements and has a good calibration date?

  • Safe entry requirements have been met (hazards are controlled via LOTO, forced air ventilation, etc. to allow safe entry)?

  • All appropriate safety equipment being used and or available?

  • Is there an Attendant? Are they trained?

  • Is there rescue equipment and plans in place?

  • All hazards have been eliminated or engineered out for the duration of the work assignment?

  • If the hazards have not been eliminated or engineered out then the confined space becomes permit required.

Ladders and Scaffolding

Ladders and Scaffolds

  • Proper ladder for the job?

  • Ladders secured and tied off when necessary (when used as access to elevated working surface)?

  • Ladders positioned properly?

  • Ladders in Good working condition?

  • Damaged ladders need to be tagged out of service and or disposed of

  • Scaffolding written inspection completed by competent person?

  • Scaffolding guardrails have top rail (45''-39''), mid rail (halfway between top rail and deck), and toe board (3'')?

  • Scaffolding in good working condition as identified by inspection tag?

  • Scaffolding components are matching manufacturers?

  • The competent person is aware and can explain how the mis-match will not alter the 4 times max intended load required rating?

Elevated Work

Harness and Equipment

  • PFAS in good working condition?

  • Safe and certified anchor points (minimum 5000lbs per worker)?

  • Compatible hooks and equipment?

  • Proper equipment for elevated job requirements?

  • Current inspection on all equipment?

  • PFAS and fall protection systems training?

Elevated Work Areas Heights

  • Openings in floors and walls guarded?

  • Appropriate fall protection being used?

  • Guardrails in place where necessary?

  • Guardrails built correctly using top rail (45''-39'' and support 200lbs), mid rail (21'' minimum or halfway between top rail and deck), toe board (3.5'')?

  • Guardrails built correctly using top rail that supports 200lbs of force, mid rail that supports 150lbs of force, and toe board that supports 50lbs of force?

Environmental

Environmental Hazards

  • Environmental control plan available for site?

  • For heavy dust operations, are engineering controls in place to keep the exposure down?

  • Controls have been established to prevent runoff into sewer drain?

Summary of Audit Findings

  • Summary of Findings

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.