Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Date to install flooring in unit.
-
Select date
Date THC building management was notified?
-
Select date
Flooring Pre-Delivery Items
-
Was notification at least 48 hours prior to desired date?
-
Was tenant notified that JMW would performing work on the above date?
-
Was flooring material delivered to the unit free from damage?
Flooring Pre-Installation Items
-
Time JMW entered unit to begin construction
-
Are their any pre-existingting damage to unit items?
-
Add media
-
Are there any furniture or personal items that need to be moved?
-
If yes, were photos/video taken to document condition?
-
Once items were moved did any damage occur?
-
If yes, explain what damage occurred and provide photos.
-
Has JMW proper protection for the floors?
-
Has JMW provided proper dust protection for the unit?
-
Are there any Pre-existing damaged items (including stains on the floors)?<br>
-
Is there any signs of infestation? If yes, notify THC Management immediately!
-
If yes, were photos taken to document these items before they were handled?
-
Add media
Flooring Installation Checklist
-
Is gypsum board missing behind cove base? / Cove base has been previously removed before JMW started work.
-
Has new flooring been installed correctly?
-
Have all floor(s) been installed per manufacture's recommendations?
-
Is new flooring level? Any issues?
-
Has all the trash/debris from installation been removed from the unit?
-
Has furniture and personal items been returned to their original location?
-
Did any damage to these items occur?
-
If yes, explain in the space below and add photos.
-
If no, we're photos/videos taken to document condition.
-
Add media
-
Are there any punchlist items that JMW will have to return to complete? If yes explain below.
Review
-
Follow up Notes
-
Time JMW completed work in unit and exited?
-
THC Signature
-
JMW Signature