Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Date to replace kitchen cabinets?

  • Select date

Date THC building management was notified?

  • Select date

Kitchen

  • Was notification at least 48 hours prior to desired date?

  • Was tenant notified that JMW would performing work on the above date?

  • Are all items removed from the surface of cabinets & counters?

  • Are all items removed from the interior of the cabinets?

  • Has JMW provided proper protection of the floors?

  • Has JMW provided proper dust protection for the unit?

  • Is there any under counter or under cabinet lighting present?

  • If yes, has it been removed & protected?

Kitchen Demo Checklist

  • Time JMW entered unit to begin construction

  • Have all supply lines to plumbing fixtures been turned off or capped?

  • Have all cabinets been removed from the unit?

  • Has the THC-building management inspected wall behind the cabinets?

  • Is there mold present in the unit?

  • If yes has it been remediated?

  • Is there any damaged sheet rock that needs to be repaired?

  • If Yes, has it been repaired properly? (tapped and mudded?)

  • Is there any signs of infestation? If yes, notify THC Management immediately!

  • Is there any reason that installation cannot begin immediately?

  • If yes then add explanation below.

Kitchen Installation Checklist

  • Have all cabinets been installed plumb and level per drawings?

  • Have all countertops been installed per the drawings?

  • Have sink and faucet been installed per the drawings and specs?

  • Have all joints been properly caulked and sealed?

  • Do all cabinet doors operate properly?

  • Does sink and faucet operate properly and without leaks?

  • Has all necessary touch up painting been completed?

  • Has all construction debris and dust been removed from unit?

  • Have splash guards at range been installed where applicable?

  • Have all appliances been reinstalled? Any damage?

  • Are there any punchlist items that JMW will have to return to complete? If yes explain below.

  • Have all OEM & applicable forms been turned over to THC Management?

Review

  • Follow up Notes

  • Time JMW completed work in unit and exited?

  • THC Signature

  • JMW Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.