Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Date to replace kitchen cabinets?
-
Select date
Date THC building management was notified?
-
Select date
Kitchen
-
Was notification at least 48 hours prior to desired date?
-
Was tenant notified that JMW would performing work on the above date?
-
Are all items removed from the surface of cabinets & counters?
-
Are all items removed from the interior of the cabinets?
-
Has JMW provided proper protection of the floors?
-
Has JMW provided proper dust protection for the unit?
-
Is there any under counter or under cabinet lighting present?
-
If yes, has it been removed & protected?
Kitchen Demo Checklist
-
Time JMW entered unit to begin construction
-
Have all supply lines to plumbing fixtures been turned off or capped?
-
Have all cabinets been removed from the unit?
-
Has the THC-building management inspected wall behind the cabinets?
-
Is there mold present in the unit?
-
If yes has it been remediated?
-
Is there any damaged sheet rock that needs to be repaired?
-
If Yes, has it been repaired properly? (tapped and mudded?)
-
Is there any signs of infestation? If yes, notify THC Management immediately!
-
Is there any reason that installation cannot begin immediately?
-
If yes then add explanation below.
Kitchen Installation Checklist
-
Have all cabinets been installed plumb and level per drawings?
-
Have all countertops been installed per the drawings?
-
Have sink and faucet been installed per the drawings and specs?
-
Have all joints been properly caulked and sealed?
-
Do all cabinet doors operate properly?
-
Does sink and faucet operate properly and without leaks?
-
Has all necessary touch up painting been completed?
-
Has all construction debris and dust been removed from unit?
-
Have splash guards at range been installed where applicable?
-
Have all appliances been reinstalled? Any damage?
-
Are there any punchlist items that JMW will have to return to complete? If yes explain below.
-
Have all OEM & applicable forms been turned over to THC Management?
Review
-
Follow up Notes
-
Time JMW completed work in unit and exited?
-
THC Signature
-
JMW Signature