Title Page
-
Project Name
-
Project Number
-
Work Activity/Work Task
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Instructions:
-------------------------------------
1. Answer "Adequate or Inadequate" for the questions below.
2. Fill out required fields and answer other questions as needed.
3. Add photos and notes/comments by clicking on the paperclip icon.
4. To add a Corrective Measure click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority and due date.
5. Complete audit by providing a digital signature.
6. Share your report by exporting as PDF, Word, Excel or Web Link.
JOB HAZARD ANALYSIS
-
To start the job hazard analysis click "Add Step"
Step
-
Identify the Step
-
Hazard ( Considerations to: People, Equipment, Material, Environment, Tools,(Chemical, Biological, Physical, Hygiene and Ergonomics )
-
Pre-control Risk Rating
-
Control
-
Post Control Risk Rating
-
Controls Verified
-
Scroll up and click + to add more
REVIEWED BY:
-
Supervisor:
-
Foreman:
-
Safety rep:
SPECIAL REVIEW BY:
-
Name and Signature
CREW REVIEWED WITH SIGNATURES
-
CREW REVIEWED: (to add name and signature of Crew who reviewed the JHA, click Add Crew)
Crew
-
Name and Signature of Crew
-
click + to add more
JOB HAZARD ANALYSIS AUDIT
-
Work Activity/Work Task Description
-
Steps Identified
-
Hazard Identification
-
Pre/Post control Risk Rating
-
Hazard Controls
-
Controls Verified
-
All sections completed
-
Review Signatures Required
-
Crew Signatures
-
JHA at task location
COMPLETION
-
Auditor’s Name and Signature