Title Page
-
Conducted on
-
Work Order#
-
Job Description
-
Location
-
Crew
-
Crew Foreman
-
Personnel
-
Truck #'s
-
Inspection Type
- Regular
- Outage/Emergency
-
Job
- Energized
- De-energized
- Distribution
- Secondary
- Overhead
- Underground
-
Equipment
- Service < 26,000
- Bucket
- Digger Derrick
- Pressure Digger
-
Tested
- Dielectric
- Structural
-
Other Equipment
- Hydro-Vac
- Trencher
- Backhoe
- Wire Trailer
-
Other:
PPE
-
PPE - A "NO" answer requires a comment.
-
Hard Hat(s)
-
Eye Protection
-
Hearing Protection
-
Foot Protection
-
Hand Protection
-
Rubber Gloves
-
Rubber Sleeves
-
Fall Protection
-
FR Clothing
-
Pre-Use Inspection
Job Preperation
-
Job Communication
-
Job Briefing
-
Documented Prior to Work
-
Location Reported
-
Hotline Tag
-
Recloser - Single Operation/Bypass Cutout
-
Grounding
-
Truck
-
Conductor Tested
-
Pre-Use Inspection
-
Personal Grounds
-
Conductor Tested
-
Pre-Use Inspection
-
Cover Up
-
Adequate
-
Serviceable
-
Pre-Use Inspection
-
Traffic Control
-
Beacon/Strobe
-
Four Way Flashers
-
Reflective Vests
-
Cones Adequate
-
Signs Adequate
-
Flagger(s)
Job Preparation Continued
-
Poles
-
Inspected
-
Adjacent Poles
-
Adjacent Spans
-
Ladders
-
Inspected
-
Proper Placement
-
Secured
-
Live Line Tools
-
Pre-Use Inspection
-
Clean
-
Serviceable
Comments
-
OTHER CONDITIONS & WORK PRACTICES INVOLVED:
-
COMMENTS/CORRECTIVE ACTIONS:
-
Foreman/Lineman in Charge:
-
Inspected By:
Photos
-
Add media