Information

  • Client / Site

Work Approval

Customer Details

  • Customer Name

  • Site Address

Work Details

  • Work Undertaken

  • Materials Used

  • Diagram

Staff Details

  • Staff 1

  • Time

  • Staff 2

  • Time

  • Staff 3

  • Time

Authorisation

  • Intechsys

  • Customer

Site Specific Risk Management Form

Applicable Safe Work Method Statements

  • Asbestos

  • Confined Spaces

  • Demolition

  • Excavation and Trenching

  • Hazardous Substances

  • Heights

  • Plant

  • Working near Overhead Powerlines

  • Working on or near a Road

  • Working on or near Exposed Energised Electrical Equipment

Acknowledgement

  • I certify that the above control measures have been implemented.

  • Worker in Charge

  • Staff 1

  • Staff 2

  • Staff 3

Electrical Test Record

Test Record

  • I certify that the electrical installation to the extent that it is effected by the electrical work, has been tested to ensure it is electrically safe and is in accordance with the requirements of the wiring rules and any other standard applying to the electrical installation under state legislation.

  • Tested by:

  • Electrical worker in charge:

Circuit 1

  • Circuit or Equipment

  • Visual Inspection Complete

  • Circuit Number

  • Protection Size and Type

  • Neutral Number

  • Phase

  • Cable Size

  • Continuity Test - Ohms

  • Insulation Resistance - MOhms

  • Polarity Test

  • Fault Loop Impedance Test - Ohms

  • Operational Test

  • Test Date

Circuit 2

  • Circuit or Equipment

  • Visual Inspection Complete

  • Circuit Number

  • Protection Size and Type

  • Neutral Number

  • Phase

  • Cable Size

  • Continuity Test - Ohms

  • Insulation Resistance - MOhms

  • Polarity Test

  • Fault Loop Impedance Test - Ohms

  • Operational Test

  • Test Date

Circuit 3

  • Circuit or Equipment

  • Visual Inspection Complete

  • Circuit Number

  • Protection Size and Type

  • Neutral Number

  • Phase

  • Cable Size

  • Continuity Test - Ohms

  • Insulation Resistance - MOhms

  • Polarity Test

  • Fault Loop Impedance Test - Ohms

  • Operational Test

  • Test Date

Circuit 4

  • Circuit or Equipment

  • Visual Inspection Complete

  • Circuit Number

  • Protection Size and Type

  • Neutral Number

  • Phase

  • Cable Size

  • Continuity Test - Ohms

  • Insulation Resistance - MOhms

  • Polarity Test

  • Fault Loop Impedance Test - Ohms

  • Operational Test

  • Test Date

Circuit 5

  • Circuit or Equipment

  • Visual Inspection Complete

  • Circuit Number

  • Protection Size and Type

  • Neutral Number

  • Phase

  • Cable Size

  • Continuity Test - Ohms

  • Insulation Resistance - MOhms

  • Polarity Test

  • Fault Loop Impedance Test - Ohms

  • Operational Test

  • Test Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.