Information
-
Site
-
General Contractor
-
Conducted on
-
Prepared by: Hermanson Company LLP 1221 2nd Ave North Kent, Wa 98032 www.hermanson.com
1.0 Safety Plans
-
1.1 Site Specific Safety Plan on site?
-
1.11 Are employees oriented and signed off?
-
1.2 Site Specific Safety Plan for Subcontractors?
-
1.05 Other?
2.0 JHA/JSA/PTP/Work Permits
-
2.1 Job description adequate?
-
2.2 PTP completely understood by all?
-
2.3 PTP hazards and precautions match?
-
2.4 Quality of PTP steps and hazards?
-
2.05 Other?
3.0 Personal Protection
-
3.1 Hard hats, glasses, goggles, hearing protection?
-
3.2 Barricades up where applicable?
-
3.3 Proper gloves in use?
-
3.4 Job-specific PPE as required?
-
3.5 High visibility vests?
-
3.05 Other?
4.0 Safety Equipment
-
4.1 Fire extinguisher(s) in place?
-
4.2 Fire extinguisher(s) inspections complete?
-
4.3 Eyewash available? Not expired?
-
4.4 First aid kit available?
-
4.5 First aid kit stocked properly?
-
4.05 Other?
5.0 General
-
5.1 Lighting?
-
5.2 Ventilation?
-
5.05 Other?
6.0 Tools and Equipment
-
6.1 Proper tools in use/used properly?
-
6.2 Guards/safety devices in place?
-
6.3 Tools in good condition?
-
6.05 Other?
7.0 Body Positioning/Movement
-
7.1 Line of fire risk?
-
7.2 Attention to task?
-
7.3 Pinch points?
-
7.4 Proper lifting?
-
7.5 Avoid/protected from sharp edges?
-
7.05 Other?
8.0 Housekeeping
-
8.1 Work areas clean and neat?
-
8.2 Barricades maintained?
-
8.3 Cords rolled and stowed?
-
8.4 Materials properly staged/stored?
-
8.05 Other?
9.0 Fall Protection
-
9.1 Guardrails in place?
-
9.2 Warning lines used?
-
9.3 Guardrails/warning lines installed correctly?
-
9.4 100% fall protection over 4' achieved?
-
9.5 Proper fall protection equipment?
-
9.6 Fall Protection Work Plan for work over 10'?
-
9.05 Other?
10.0 Working at Height/Scaffolding/Ladders
-
10.1 Decking complete w/o holes?
-
10.2 Scaffold tag in place/current?
-
10.3 Area below barricaded?
-
10.4 Ladder extends 3' above landing?
-
10.5 Cage on vertical ladder over 25'? Rest platform(s)?
-
10.05 Other?
11.0 Walking Working Surfaces
-
11.1 Aisles/stairs/floors clear/clean?
-
11.2 Designated walking area?
-
11.3 Holes 1" and larger covered?
-
11.05 Other?
12.0 Mobile Equipment/ Lifts
-
12.1 Forklift Pre-use inspection complete?
-
12.2 Aerial Lift Pre-use inspection complete?
-
12.3 Proper training?
-
12.4 Spotter used when appropriate?
-
12.05 Other?
13.0 Electrical
-
13.1 Assured Grounding complete? Correct color (Q1-white, Q2-green, Q3-red, Q4-orange) if required?
-
13.2 GFCI use on all power cords/tools?
-
13.3 Extension cords in good shape?
-
13.05 Other?
14.0 Welding/Grinding/Temporary Power
-
14.1 Hoses, leads, cords hung properly?
-
14.2 Sparks controlled?
-
14.3 Fire watch present?
-
14.05 Other?
15.0 Cranes/Lifting/Hoisting/Rigging
-
15.1 Crane(s) inspected/documented?
-
15.2 Operator NCCCO certificate?
-
15.3 Qualified signal-person? Documentation onsite?
-
15.4 Qualified rigger? Documentation onsite?
-
15.5 Ground is level/firm?
-
15.6 Rigging is inspected/undamaged?
-
15.7 Tag lines/softeners used?
-
15.8 Critical Lift Plan done, if required?
-
15.9 Overhead powerlines considered?
-
15.10 Personnel not under suspended loads?
-
15.05 Other?
16.0 Excavation Work
-
16.1 Daily inspection conducted?
-
16.2 Daily inspection documented?
-
16.3 Over 4' inspected by competent person?
-
16.4 Excavation shored/sloped/benched?
-
16.5 Spoils pile at least 2' from edge?
-
16.05 Other?
17.0 Confined Space
-
17.1 Attendant trained and alert?
-
17.2 Confined space signs posted at entrance(s)?
-
17.3 Personnel in confined space(s) checked in/out?
-
17.4 Ventilation in place/adequate?
-
17.05 Other?
18.0 Cylinders/Hazardous Materials/Flammables/Combustibles
-
18.1 Flammable/O2 bottles stored properly?
-
18.2 Proper storage containers for flammables/combustibles?
-
18.3 Secondary labeling for chemicals?
-
18.05 Other?