Information
-
Audit Title
-
PROJECT NUMBER
-
GENERAL CONTRACTOR
-
Conducted on
-
Prepared by
-
Location
-
Personnel
JOB INFORMATION
-
OSHA 300 forms complete and posted from February 1 - April 30?<br>
-
OSHA and DOL posters posted?
-
Emergency phone numbers posted?
-
Tool box safety talks log up to date?
-
Weekly required jobsite safety inspections conducted?
-
MSDS filed?
HOUSEKEEPING
-
Work areas neat?
-
Projecting nails or screws bent over or removed?
-
Waste containers provided and used?
-
Passageways and walkways clear?
-
Cords and leads off the floor?
FLOOR & WALL OPENINGS
-
All floor openings planked over or barricaded?
-
Perimeter protection in place?
-
Deck planks secure?
-
Materials stored away from edge?
FIRE PREVENTION
-
Adequate fire extinguishers provided?
-
Fire Extinguishers accessible?
-
Fire Extinguishers inspected?
-
Phone no. of Fire Department posted?
-
"No Smoking" posted and enforced near flammables?
ELECTRICAL
-
Ground fault interrupters being used?
-
Panels clearly identified and secured?
-
Panel Schedules updated?
-
Only qualified electricians allowed access?
-
Terminal boxes equipped with required covers?
-
Temporary cords with bare wires or missing ground prongs taken out of service?
LIGHTING
-
Illumination sufficient for work being performed?
-
All temporary lighting originated from a separate branch circuit?
-
Temporary lighting fixture cages closed?
-
All temporary lighting supported by non conductive material?
-
Temporary Lighting supported every 10 feet?
-
Temporary Lighting installed at appropriate height?
LOCK-OUT TAG-OUT SYSTEMS
-
Locks with individual keys given to each electrician?
-
Personalized danger tags provided to each person?
-
Lock out system being utilized will reduce power to a zero-energy state?
-
All personnel test to verify and confirm zero energy?
HAND, POWER & POWDER ACTUATED TOOLS
-
Hand tools inspected regularly?
-
Electrically grounded?
-
Guards in place on machines?
-
Correct tool being used for job at hand?
-
Personnel adequately trained in the use of their tools?
-
Power cords in good condition?
-
Operators of powder actuated tools licensed?
FALL PROTECTION
-
Safety rails and cables secured properly?
-
Safety harnesses worn properly?
-
Anchor points capable of supporting 5000 lbs.?
-
Adequate anchor points available?
-
Employees exposed to fall hazards tied off?
-
100 % use while in aerial lifts and bucket trucks?
-
Employees below protected from falling objects?
LADDERS
-
Serviceable?
-
Proper Use?
-
Not standing on two top steps
-
Proper height for the task
-
Stepladders in fully opened and locked position
-
Straight ladders used for access extend three feet above landing
-
Proper Ratio (4:1)
-
Three points of contact when ascending / descending
-
Ladders are secured to prevent slipping, sliding or falling?
-
Ladders with split or missing rungs taken out of service?
SCAFFOLDING
-
All scaffolding inspected daily?
-
Erected on sound rigid footing?
-
Tied to structure as required?
-
Guardrails, intermediate rails, toe boards and screens in place?
-
Planking is sound and sturdy?
-
Proper access provided?
-
Employees below protected from falling objects?
STAIRS
-
Uniform height and tread depth?
-
Grating type tread on exterior stairs?
-
Sturdy railings on all open sides?
-
Stairs free of stored materials and clutter?
-
Stairways equipped with adequate lighting?
TRENCHES, EXCAVATION & SHORING
-
All trenches and excavations have been inspected?
-
Competent person identified and present?
-
Excavations are treated as type "C" and sloped at 1 1/2 : 1?
-
Materials and spoil are stored at least 2' away from trench?
-
Shielding / Shoring in place (if over 5')?
-
Designed by engineer (if over 20')?
-
Ladders provided every 25' in trench?
-
Equipment is at a safe distance from edge of trench or excavation?
MATERIAL HANDLING
-
Materials properly stored or stacked?
-
Employees using proper lifting techniques?
-
Tag lines used to guide loads?
-
Proper number of workers for each operation?
WELDING AND BURNING
-
Gas cylinders stored upright?
-
Proper separating distances between fuels & oxygen?
-
Goggles or shields used?
-
Fire extinguishers readily available?
-
Hoses in good condition?
CRANES
-
Outriggers extended and swing radius barricade in place?
-
Operator is familiar with load charts?
-
Hand signal charts on crane?
-
Crane operator logs up to date?
-
Employees kept from under suspended loads?
-
Chains and slings inspected and tagged as required?
CONCRETE CONSTRUCTION
-
Employees are protected from cement dust?
-
Exposed skin covered?
PERSONAL PROTECTIVE EQUIPMENT
-
Hard hats being worn?
-
Safety glasses being worn?
-
Gloves properly chosen for work performed?
-
Respirators used when required? Proper respirator documentation available?
-
Hearing protection being worn when required?
-
Traffic vests or high visibility clothing material being worn?
RECOMMENDATIONS
-
List any additional recommendations or corrections
SIGNATURES
-
MILLER ELECTRIC REPRESENTATIVE
-
SAFETY REPRESENTATIVE