Information
-
Document No.
-
Job Name
Questions
Basic Info
-
Job No:
-
Inspector(s):
-
Foreman:
-
Project Manager:
Electrical Items
-
Panel Trims On
-
Panel Interior Trim On
-
Panel KO's Blanked Up
-
All Open Breaker Slots to be Filled Up with either Breakers of Blank Ups
-
Panel Circuit Directory Filled Out
-
Danger High Voltage Keep Out Sign on Panel and Electric Room
-
Voltage marked on panel & electric room door
-
Proper Cable Conn. On Temp. Panels & Boxes
-
Tie Wraps or Insul. Solid Wire
-
Wiring proper size to handle load
-
Sufficient lighting
-
All stringers have light cages
-
All receptacles GFCI protected
-
All Temp Boxes Securely Mounted to wall, ceiling, etc.
-
Have existing electrical conditions, which are not up to standards been surveyed & addressed to the Contractor or Owner?<br>
-
No Storage of Material in Electric Room
-
Any electrical work, or work by other trades<br>which are creating unsafe conditions been<br>addressed to contractor or owner?<br>
Personal Protective Equipment
-
Hard hats being worn
-
Goggles being used
-
Safety belts in use where needed
-
Ear plugs being used
-
Retrieval System in use where needed
-
High Voltage Equipment in Use Signs Where Needed<br>
-
Masks for dust & Welding in use
Tools
-
Tools & Cords in good condition
-
Tools & Cords have proper grounding
-
All mechanical safeguards in place
-
GFCI pigtails in use on building permanent power
-
Men using right tool for right job
-
Defective tools tagged & returned to office for repair "Do not keep defective tools on job"<br>
Scaffolds & Ladders
-
Guard Rails in place
-
Toe board in place
-
Scaffold Work area totally planked
-
Scaffold Access Adequate
-
Out Riggers used where needed
-
All parts of scaffolding of same manufacturer
-
Safety belt & line in use
-
Ladders inspected regularly
-
Are ladders tied off?
-
Ladders Extend 3' above landing
-
Step ladder fully open when in use
Housekeeping
-
Work area clear of debris
-
Regular rubbish disposal
-
Passage & walkways clear of rubbish & obstacles
-
Are Toilets adequately kept clean
-
Adequate drinking water & cups
-
Wash facilities available
Hazard Communication Program
-
Have all employees received training?
-
Are MSDS Sheets for hazardous material used on the job at the jobsite?
Miscellaneous
-
OSHA & All other Posters Posted
-
First Aid kit on job
-
Railings in place around outer perimeter, stairs, pits, etc.
-
Emergency Telephone Numbers Posted
-
Monthly & weekly tool box meeting being held
Comments
-
Please Write Additional Concerns or Comments here.