Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Has previous audit report been closed out
Documentation
-
Has asbestos survey been issued were applicable and information given to subcontractors
-
Is CDM Coordinators information available on site
-
Is the health safety plan on site and is it signed by the Project Manager / Site Manager
-
Are there any community benefits schemes in place and local resident been informed of works
-
Is there and induction process in place and records available
-
Have Medical record forms been used
-
Has a risk assessment of site activities been carried out by the site Manger
-
Have RAMS appraisal forms been completed and signed by subcontractor supervisor
-
Are subcontractors RAMS been signed by those involved in the task
-
Have PUWER and LOLER registers been completed
-
Has electrical register been issued to contractors for the PAT testing of their equipment
-
Are site services drawings on site including Gas, Water, BT, Electric and Fibre Optic Cable
-
Have any safety observations been undertaken
-
Have any safety notices been issued
-
Are subcontractors wearing colour coded hi vis as per company requirements and is it either their own or K&C
-
Have toolbox talks been carried out and do they include everyone on site
External Access
-
Is there adequate signage displayed and is it clean and in good order
-
Is emergency access unobstructed
-
Is hazard board displayed and up to date.
-
Protection of the public - is fencing secured
-
Are the routes to the office signposted
Hazard Controls
-
Are overhead cables identified with goal posts and butting
-
Are underground cable identified and marked so that others can see them.
-
Is the electrical distribution secured and signed
-
Are excavations battered back or trench boxes in use - area segregated with fencing
-
Is there adequate lighting available for safe passage around the site
-
Are 110 volt tools only- being used on site
-
Are any slip trips falls hazards controlled
-
Are any Housekeeping issues on site controlled
-
Is No smoking signage displayed - designated smoking areas
Traffic Management
-
is there a traffic management plan drawn up by the site manager
-
Are there controls in place to segregate vehicle movements from pedestrians on site.
-
External road clean and fee from mud
-
Parking areas allocated and vehicles parked safety
-
Use of banksman when needed
Fire
-
Is there a fire plan marked up and conveyed - Fire log used
-
Has a fire drill been carried out
-
Fire extinguisher points available in the building and extinguishers in date
-
Fire alarm system in place and adequate
-
Hot works permits issued for the day and signed - controls in place
-
Flammable substances stored securely
Plant and Machines
-
Machine Drivers competent and training cards recorded
-
Plant in good order and daily checks undertaken by the operator
-
mirrors, lights and safety belts - safety pins in quick hitch , CCTV
-
Permit to dig in place
Procedures
-
Visitor signing in point available
-
PAT testing regime in place
-
Electrical register issued to subcontractor for PAT testing
-
Accident book available
-
Any accidents reported since last audit
-
Accident investigations carried out
-
First aid kit available and stocked
-
First aider identified and first aid register filled out
-
Health and Safety banner displayed and filled
-
Site Manager SMSTS trained
-
F10 up to date and Insurances displayed
Welfare
-
Site Cabins tested
-
Heating, lighting available
-
Hot and cold running water available
-
Kettle and microwave available
-
Welfare clean and tidy
-
Toilets clean and occupational health posters displayed
Work at height
-
Scaffold inspected and tagged
-
Scaffold erected to SG4
-
Tower scaffold erected properly with guardrails and toeboards in place- Tower tagged
-
Ladders and step ladder inspected Class 1 - tagged
-
Loading bay gates closed when not in use
-
Internal fall controls in place
-
Safe Access to work at height
-
safety harnesses being worn were appropriate
-
Where trestles are in use is handrail system in place and safe access available
-
where safety fall bags are in sue are the used correctly and clipped together
-
Where MEWPS are in sue are they being used correctly - restraint harness, area segregate , fall zone.
-
Appropriate equipment for the task being used WHA hierarchy
-
If netting is in use has it been inspected and handover certificate issued
COSHH
-
Have COSHH assessments been carried out for all potentially hazardous substance being used on site
-
Are there appropriate control systems in place and PPE available and being used
Demolition
-
Has a competent person been appointed to overs the demolition operation
-
Has the structural stability been checked and temporary supports been installed where required
-
Are any temporary works designs required
-
Have all service been disconnected
-
is the area securely segregated with barriers and signage displayed
-
IS there adequate dust suppression in place
-
Are there suitable noise controls in place
-
Is there suitable lighting available were required
-
Is demolition material being removed from site on a regular basis and not allowed to accumulate
-
Are demolition operatives adequately trained, supervised E
Environmental Management
-
Are there any invasive plates, if so are precautions adequate
-
Are there any TPO's (tree protection orders in place)
-
Have all practical measure been taken in increase energy efficiency on site
-
Are spill kits and spill trays available
-
Waste transfer notes available
Lifting equipment
-
Is there a competent person in charge of the lift to coordinate lifting operations
-
Is there lifting plan in place
-
Has lifting equipment been tested and is it regularly inspected
-
Is the crane operator trained and competent
-
Have ground checks been done and is there sufficient space for it to operate safely
-
Are any overhead services identified and goal posts, bunting and signage in place
Risk assessments and Method statements
-
Are method statements and risk assessments available on site
-
Has the Site Manager carried out and appraisal of each RAM's and have all operative signed the document
-
Has the site manager carried out a random inspection of the adequacy of a subcontractors RAMS
Temporary Works
-
Is there a design available for temporary works
-
Has a competent temporary works Designer been appointed
-
Has a competent Temporary works coordinator been appointed
-
Is there a Temporary Works supervisor appointed
-
Is there a temporary works register and is it maintained
-
Are RAM's available for temporary works
-
Is there a permit to load and permit to strike procedure in place
-
Other
Sign off
-
I confirm that I have had the contents of the report explained to me
-
Site Manager
-
Person conducting the audit
-
Audit finished
-
Actions to be resolved ASAP any work deemed unsafe is to stop until adequate controls are put in place.