Information
-
Kangan Aviation Department Practical Task
-
Pipe manufacture and fitting exercise
-
Student Name
-
Conducted on
-
Instructor
-
Location
-
Refer to AC43.13B
-
Click here for additional information. Nil
http://leithdonaldson.wix.com/test -
Equipment required:
Bench Mechanics Toolkit
Pipe bender bench
Pipe flaring bench
Ferrules and B nuts to suit
Pocket calculator for bend allowance calculations -
Before commencing the task, i have referred to the checklist.
-
I have prepared for the task, taking into account OH&S needs<br>
-
I have carried out the task in accordance with the relevant documentation.
-
Take a photo of area where pipe is fitted to engine
-
Add media
-
Add media
-
I have answered any questions relating to the task successfully.
-
I have completed all documentation relating to the task.
-
I have returned all equipment and documentation to it's correct storage location.
Certification
-
Please enter details of your task.
-
Student's Signature
-
Student ID Number
-
Date
-
Assessor's Signature
-
Date