Title Page
-
Conducted on
-
Prepared by
-
Location
-
Check reactive issue identified
-
Inverter issue
-
Phone manufacturer and carry out recommended checks
-
Record results
-
Record Inverter Serial No.
-
Record Inverter Manufacturer
-
Record Inverter Model
-
Attach photo of inverter
-
If inverter needs to be replaced, use RMA template.
-
Monitoring issue
-
Check that the router or fixed LAN has an internet connection
-
Reset datalogger and router and call manufacturer to check if monitoring has been reinstated
-
Log into datalogger and ensure that all equipment is visible
-
Record results
-
Record Serial No.
-
Record datalogger manufacturer
-
Record datalogger model
-
Attach photo of datalogger
-
If datalogger needs to be replaced, use RMA template.
-
AC issue
-
Check mains connections for loose connection or sign of burning
-
Check operation of Mains breaker device (Mechanically)
-
Ensure protection device ratings are as per system specification
-
Record results
-
DC issue
-
Visually asses the pollution and shading of the PV modules (on roof)
-
Check of the screw joints on the PV frame, and tightening of loose joints
-
Check of the stability of the PV frame construction
-
Check of fixing of the PV modules to the frame construction
-
Check and test the DC connectors (both serial and parallel connections)
-
Check the solar cables for damage, fixings and containment
-
Assess the grounding connection points, their possible repair, conservation, and corrosion removal (if applicable)
-
Assess the PV modules for the mechanical destructions or abnormal colouring
-
Record any detected issues
-
Measurements of selected modules and strings with power meter
-
Test selected modules and strings with power meter, record the results here
-
Sample test of modules and all electrical connections for hot spots with thermography
-
Record any detected defects
General to be checked and recorded regardless of issue
-
Record generation meter reading
-
Record main meter reading (where possible)
Check inverter operation and record any issues and serial No’s of the units
-
Check all labels as per MCS requirements
-
Record labelling issues here
-
Check for any potential issues caused by change of building use
-
Record results here
-
Record site contact and access arrangements
-
Record RAMS (add to audit)
-
Record any changes to site operations or new H&S considerations