Title Page
-
Site ID
-
Site Name
-
Engineer Name
-
Date Of Works
Office
-
Picture of Router Installed
-
Picture of PC with Internet Browser Open - Proving connects to internet
-
Picture of BOH Printer Printer with Test Print Receipt in it
-
Picture showing PC with Monitor, Keyboard, Mouse and Printer
-
Picture of Inside Comms Cab - Labelled
-
Picture of Comms Cab - Area
QSR Screens
-
QSR Screens - Add per Screen on Site
-
Name of Screen
- Order Ready Screen
- FC Presenter Screen
- Drinks / Dessert Screen
- FC Assembly Screen
- DLVR Assembly Screen
- DT Assembly Screen
- Chicken Pack Screen
- DT Presenter Screen
- Burger Screen
-
Picture with Screen On
-
Any issues with the Screen?
-
What are the issues?
QPM
-
Picture of the Input Device
-
Picture of MOH Screen 1
-
Picture of BOH Screen 2
-
Picture of the QPM Gateway
-
Any Outstanding Issues
-
What is outstanding?
Tills
-
Tills - Add per Tills on Site
-
Picture of Till Bundle (Till Screen on and working, Receipt Printer with test print receipt in it, Cash Drawer Open if applicable, Tethered Ped with screen on if applicable.
-
Are there any outstanding actions?
-
What is outstanding?
Kiosks
-
Kiosks - Add per Kiosk on Site
-
Picture of Installed Kiosk
-
Are there any outstanding actions?
-
What is outstanding?
AP's
-
AP's - Add Per AP on Site
-
Location
-
Picture showing AP light to show its on
-
Are there any outstanding actions?
-
What is outstanding?
Transaction Evidence
-
Picture of a Card Transaction from a Till
-
Picture of a Card Transaction from a Kiosk
Boot Stock
-
Have you used any items from your Boot Stock?
-
What have you used?
-
Serial Number of Installed Equipment
-
Serial Number of Deinstalled Equipment
-
Reason for using Boot Stock
Additional Work
-
Have you been asked to do any additional works / any changes that were not in scope?
-
Name of the Person
-
Position of the Person
-
What have you been asked to do
Sign Off & Handover
-
Is the Install Complete?
-
Customer Acceptance Name and Signature
-
Engineer Name and Signature
-
By signing the below customer acceptance, you are confirming that all of the equipment on your site is in working order and has been tested and handed over to you by our Engineer