Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Administrative :

  • Select date

  • Superintendent or Designee Making Inspection:

  • Job #:

  • Job Name:

  • Approx. Number of Employees on Site?

Plans and Postings:

  • Emergency Evacuation Action Plan Complete & On Site?

  • OSHA Manual On Site?

  • OSHA 300 Log Posted? (Post February 1st - April 30th)

  • KMC Safety Manual On Site?

  • Emergency Phone Numbers Posted On Site?

  • Current MSDS Sheet Inventory?

  • Weekly Safety Meeting Minutes Maintained & Filed?

  • Hazard Communication Program On Site?

  • Safety & Notification Signage In Place & Maintained?

  • First Aid Kit On Site & Maintained?

  • All In 1 Poster Posted? (English & Spanish)

Job Site Safety:

  • Housekeeping Being Maintained?

  • Fire Extinguishers On Site?

  • Do The Fire Extinguishers Have Current Tags?

  • Confined Space Work On Site?

  • Gasoline & Diesel Being Stored In Approved Safety Containers?

  • Proper Guardrails & Toe Boards On Open Sided Floors & Openings, Shafts, Etc......<br>

  • Hand Tools & Wood Handles In Good Condition?

  • Power Tools In Good Working Condition?

  • Power Tool Cords Grounded & Double Insulated?

  • Do Hoists (Personnel & Material) Have Proper Gates, Lockouts, Landings & Rails?

  • Powder Actuated Tools: Operator Certification Training Cards On Hand?

  • Powder Actuated Tools: Eye Protection?

  • Ladders In Proper Working Condition?

  • Proper Ladder Being Used?

  • Air Tools - Are Hoses Pinned?

  • Are Compressed Gases Properly Stored?

  • Formwork - Properly Shored & Stripped?

  • Vertical Rebar Covered or Capped Properly?

  • Masonry Walls Braced?

  • Scissor Or Boom Lift Training?

  • Forklift Training?

  • Fall Protection?

Cranes:

  • Crane Inspections Current?

  • Swing Radius Cleared and Guarded?

  • Clear Of Power Lines?

  • Outriggers Set Properly?

Electrical:

  • Temporary Electrical Properly Installed?

  • GFCI Protection on Temporary Electrical?

  • Cover Plates For Temporary Electrical Boxes In Place?

  • Broken Plugs On Extension Cords?

  • Insulation Damage On Extension Cords?

  • Non-Compliant Extension Cords Removed From Jobsite?

  • Lock Out/Tag Out Program Needed?

  • Lock Out/Tag Out Program In Place?

  • Temporary Electrical Panel Labels In Place?

  • Does Temporary Lighting Have Minimum of 5 Foot Candles?

Excavation & Trenches:

  • Proper Slope, Benchback, And/Or Shoring?

  • Ladders Being Utilized & Properly Placed?

  • Spoils 2 Feet Or More Back From Edge?

  • Designated Competent Person?

  • Trench Boxes Being Used And Properly Installed?

Equipment:

  • Equipment Operator Training Certification Cards?

  • Equipment Operators Wearing Seat Belts?

  • Back-Up Alarms In Proper Working Order?

  • Is Equipment Being Inspected Daily?

Scaffolding:

  • Fully Decked - No Gaps?

  • Fully "X" Braced?

  • Ladder Access?

  • Lumber: Scaffold Grade Or Equivalent?

  • Planking Overlapped & Cleated?

  • Guardrails & Toe Boards?

  • Wheels Locked On Rolling Scaffold?

  • Swing Scaffolds: Safety Belts & Lifelines?

  • Proper Footing & Mud Sills?

  • Secured To Structure Every 26' Vertically & 30' Horizontally?

  • Designated Competent Person?

Other:

  • Add media

  • Report Complete?

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.