Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Administrative :
-
Select date
-
Superintendent or Designee Making Inspection:
-
Job #:
-
Job Name:
Plans and Postings:
-
Emergency Evacuation Action Plan Complete & On Site?
-
OSHA Manual On Site?
-
OSHA 300 Log Posted? (Post February 1st - April 30th)
-
KMC Safety Manual On Site?
-
Emergency Phone Numbers Posted On Site?
-
Current MSDS Sheet Inventory?
-
Weekly Safety Meeting Minutes Maintained & Filed?
-
Hazard Communication Program On Site?
-
Safety & Notification Signage In Place & Maintained?
-
First Aid Kit On Site & Maintained?
-
All In 1 Poster Posted? (English & Spanish)
Job Site Safety:
-
Housekeeping Being Maintained?
-
Fire Extinguishers On Site?
-
Do The Fire Extinguishers Have Current Tags?
-
Confined Space Work On Site?
-
Gasoline & Diesel Being Stored In Approved Safety Containers?
-
Proper Guardrails & Toe Boards On Open Sided Floors & Openings, Shafts, Etc......<br>
-
Hand Tools & Wood Handles In Good Condition?
-
Power Tools In Good Working Condition?
-
Power Tool Cords Grounded & Double Insulated?
-
Do Hoists (Personnel & Material) Have Proper Gates, Lockouts, Landings & Rails?
-
Powder Actuated Tools: Operator Certification Training Cards On Hand?
-
Powder Actuated Tools: Eye Protection?
-
Ladders In Proper Working Condition?
-
Proper Ladder Being Used?
-
Air Tools - Are Hoses Pinned?
-
Are Compressed Gases Properly Stored?
-
Formwork - Properly Shored & Stripped?
-
Vertical Rebar Covered or Capped Properly?
-
Masonry Walls Braced?
-
Scissor Or Boom Lift Training?
-
Forklift Training?
-
Fall Protection?
Cranes:
-
Crane Inspections Current?
-
Swing Radius Cleared and Guarded?
-
Clear Of Power Lines?
-
Outriggers Set Properly?
Electrical:
-
Temporary Electrical Properly Installed?
-
GFCI Protection on Temporary Electrical?
-
Cover Plates For Temporary Electrical Boxes In Place?
-
Broken Plugs On Extension Cords?
-
Insulation Damage On Extension Cords?
-
Non-Compliant Extension Cords Removed From Jobsite?
-
Lock Out/Tag Out Program Needed?
-
Lock Out/Tag Out Program In Place?
-
Temporary Electrical Panel Labels In Place?
-
Does Temporary Lighting Have Minimum of 5 Foot Candles?
Excavation & Trenches:
-
Proper Slope, Benchback, And/Or Shoring?
-
Ladders Being Utilized & Properly Placed?
-
Spoils 2 Feet Or More Back From Edge?
-
Designated Competent Person?
-
Trench Boxes Being Used And Properly Installed?
Equipment:
-
Equipment Operator Training Certification Cards?
-
Equipment Operators Wearing Seat Belts?
-
Back-Up Alarms In Proper Working Order?
-
Is Equipment Being Inspected Daily?
Scaffolding:
-
Fully Decked - No Gaps?
-
Fully "X" Braced?
-
Ladder Access?
-
Lumber: Scaffold Grade Or Equivalent?
-
Planking Overlapped & Cleated?
-
Guardrails & Toe Boards?
-
Wheels Locked On Rolling Scaffold?
-
Swing Scaffolds: Safety Belts & Lifelines?
-
Proper Footing & Mud Sills?
-
Secured To Structure Every 26' Vertically & 30' Horizontally?
-
Designated Competent Person?
Other:
-
Add media
-
Report Complete?
-
Add signature