Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General Information
-
Type of inspection?
-
Inspection date & time?
-
Present phase of construction?
- initial site work
- heavy construction
- landscaping
- final site work
-
Is the Erosion Control Plan on site and records available?
-
Are the NOI and permit posted?
-
Is the as-built erosion control plan posted and current?
Weather Information
-
Has it Rained since the last inspection?
-
If yes, provide:
-
Weather at time of inspection?
- rain
- muddy
- sunny
- overcast
-
Do you suspect that discharges have occurred since the last inspection?
-
Are there any discharges at the time of inspection?
BMPs inspection
Temporary Construction Entrance
-
Are all ingress and egress points covered by a temporary construction entrance?
-
Is the entrance adequately preventing tracking of mud, dirt, and sediment onto roadways?
Perimeter Erosion Control
-
Is silt fence or BMP installed properly?
-
Is the silt fence or BMP maintained and in good condition?
-
Is chain link fence screen maintained and in good condition?
Site Stabilization
-
Have all disturbed areas been stabilized with temporary or permanent measures within 7 days of the end of active hydrologic disturbance?
-
Are stabilization measures effective?
Soil Stockpile
-
Is the stockpile located in an approved location? (i.e. not in floodplain or wetland)
-
Is the stockpile properly enclosed with silt fence?
-
Has the stockpile been stabilized?
Silt Dikes
-
Are silt dikes installed in accordance with the site erosion control plan?
-
Have the locations changed per the SWPP plan of record? If yes, is it noted on plans?
Wetlands and Waters Protection
-
Are all adjacent offsite wetlands protected from impact?
-
Are wetland buffers protected?
-
Are ponds and water runways protected from impact?
Sediment Basins
-
Are sediment basins installed in accordance with the site erosion control plan?
-
Have the locations changed per the SWPP plan of record? If yes, is it noted on plans?
Dewatering
-
Are appropriate dewatering BMP's in place and functioning effectively?
-
Are dewatering activities conveying sediment laden water?
-
If a sediment bag is being used, is it capturing sediment effectively?
-
Are all points of off site runoff stabilized?
Dust Control
-
Are dust control measures being used as needed?
-
Are roadways being swept and cleaned as needed?
Inlet Protection
-
Are all inlets that are or will be functional during construction protected?
-
Is the inlet protection being maintained?
Site Debris
-
Are all construction materials kept within the project limits?
Wash Outs
-
Are washouts adequate for the amount of material being discharged?
-
Are liners free from rips and tares?
-
Are washouts located in a location that will not effect water inlets?
Comments
-
Comments & Observations
Comment
-
Add comment
Signatures
-
Inspector