Standard SWPPP Site Inspection Report
Phone: 563.382.2901 Office
563.380.4327 Dave Blake
563.277.2793 Penney Neuzil -
NPDES Permit#
-
Local Permit #
-
Inspection Date
-
Inspector Signature
-
Type of Inspection
-
Construction Stage
- Pre-Grading
- Ongoing Grading
- Utilities/Underground
- Paving
- Building Construction
- Final Stabilization
- Site Closing
- Other
Stormwater Pollution Prevention Plans
-
Plans located on site and current with work.
-
Site controls up to date with work performance.
-
SWPPP updated to reflect project changes.
-
Project schedule is being followed.
-
Site inspection documentation available & current.
Objective 1-Sediment Kept on Site
-
Controls at all downslope & Site perimeter
-
Soil stockpiles at appropriate locations and stable.
-
Discharge points controlled and free of pollution.
-
Areas at or near 14 days stabilized.
-
Site traffic routes spec. with parking limited.
-
All sediment being kept from public road tracking.
Objective 2- Non-Stormwater Concerns
-
Are any dust control measures being used.
-
Concrete washout being used and maintained.
-
Are material and site features in approved areas.
-
Are clean out, storage, and maintenance areas clean.
Objective 3- In Site Summary
-
Are all site BMP’s in place and functioning?
-
Any features that are no longer needed removed?
-
Is the site properly stabilized & in compliance at this time?
Erosion & Sediment Controls
-
Stabilized construction entrance.
-
Silt fence properly installed.
-
Silt fence adequate for drainage load.
-
Compost sock.
-
Inlet protection filters.
-
Wattles.
-
Diversion structure .
-
Check dam.
-
Sediment trap.
-
Sediment basin.
-
Temporary seeding.
-
Mulching.
-
Permanent seeding.
-
Surface roughening.
-
Sodding.
-
Temporary slope drain.
-
Rolled erosion control blankets.
-
Turf reinforcement matting.
-
Georidge / Bale Checks.
-
Compost blankets.
-
Compost filter berm.
-
Triangular silt dike.
-
Vegetative filter strips.
-
Level spreader.
-
Outlet protection.
-
Dust control
-
Flocculants.
-
Flow transition mats / Scour stop.
-
Grass channel.
-
Other flow channel protection.
-
Site observations.