Title Page

  • Conducted on

  • Prepared by

  • Standard SWPPP Site Inspection Report
    Phone: 563.382.2901 Office
    563.380.4327 Dave Blake
    563.277.2793 Penney Neuzil

  • NPDES Permit#

  • Local Permit #

  • Inspection Date

  • Inspector Signature

  • Type of Inspection

  • Construction Stage

Stormwater Pollution Prevention Plans

  • Plans located on site and current with work.

  • Site controls up to date with work performance.

  • SWPPP updated to reflect project changes.

  • Project schedule is being followed.

  • Site inspection documentation available & current.

Objective 1-Sediment Kept on Site

  • Controls at all downslope & Site perimeter

  • Soil stockpiles at appropriate locations and stable.

  • Discharge points controlled and free of pollution.

  • Areas at or near 14 days stabilized.

  • Site traffic routes spec. with parking limited.

  • All sediment being kept from public road tracking.

Objective 2- Non-Stormwater Concerns

  • Are any dust control measures being used.

  • Concrete washout being used and maintained.

  • Are material and site features in approved areas.

  • Are clean out, storage, and maintenance areas clean.

Objective 3- In Site Summary

  • Are all site BMP’s in place and functioning?

  • Any features that are no longer needed removed?

  • Is the site properly stabilized & in compliance at this time?

Erosion & Sediment Controls

  • Stabilized construction entrance.

  • Silt fence properly installed.

  • Silt fence adequate for drainage load.

  • Compost sock.

  • Inlet protection filters.

  • Wattles.

  • Diversion structure .

  • Check dam.

  • Sediment trap.

  • Sediment basin.

  • Temporary seeding.

  • Mulching.

  • Permanent seeding.

  • Surface roughening.

  • Sodding.

  • Temporary slope drain.

  • Rolled erosion control blankets.

  • Turf reinforcement matting.

  • Georidge / Bale Checks.

  • Compost blankets.

  • Compost filter berm.

  • Triangular silt dike.

  • Vegetative filter strips.

  • Level spreader.

  • Outlet protection.

  • Dust control

  • Flocculants.

  • Flow transition mats / Scour stop.

  • Grass channel.

  • Other flow channel protection.

  • Site observations.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.