Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

DOCUMENTS AND PROCEDURES

IQC-schedule

  • Presence and contents of the IQC-schedule

Quality system

  • Quality system actual, documented en introduced

  • Procedures/instructions, documentation and forms (register of documents)

Responsibillities and authorities

  • Description of responsibillities, authorities and the relation between

Managment and tools

  • Description of required tools for Quality assurance

  • Description of qualifications personnel

Realizing products

  • Procedure customer complaints

  • Description of requirements and tolerance raw materials

  • Description of measuring- and control points production process, needed equipment

  • Procedure indentification en tracibillity raw materials and final products

  • Description of storing raw materials and final products

  • Calibration, identification and registration process-, lab- and other equipment

Measuring an analysing

  • Procedure or quality plan for inspection an trail

  • Procedure Non-conform products

  • Procedure and registration corrective actions

Qualification and registration personnel

  • Is there an registration qualification personnel and is it up to date

IMPLEMENTATION

INCOMING MATERIALS

  • Chemical analyses/compositions zinc

  • Chemical analysis alloys

PROCES CONTROL

Melting Furnace

  • Temperature

  • Chemical compositions

  • Chemical compositions

  • Sample
  • Batchnumber

  • Zn

  • Al

  • Cu

  • Ti

Castinginstallation

  • Temperature Zinc

  • Speed of casting

  • Length block

  • Thickness block

  • Coolsingel water

  • Air

Rollingproces (hot / cold)

  • Adjustments of rolls

  • Speed of the rolling

  • Thickness of zinc

  • Rolling pressure

  • Pull and brakeforce

  • Straightining proces

  • Cutting

  • Stamping

  • Stacking

PRODUCT CONTROL

  • Dimensions

  • Mechanical properties

  • Elongation (after 1 hr / 50 N / mm2)

  • Appearance

  • Finish

CONTROLE STORAGE AND DELIVERY

  • Storage

  • Packing

  • Marking

  • NON Conforming products

  • Loading for transport

COMPLAINTS

  • Handling complaints

CONTROL OF TESTEQUIPMENT

  • Is the test equipment calibrated en registrated

  • Are measuring instruments used from producer

  • Equipement
  • Defenition

  • ID-number

  • Last calibration

  • Calibration institute en report number

  • Are measuring instruments used from Kiwa

  • Equipment
  • Defenition

  • ID-number

  • Last calibration

  • Calibration institute en report number

PRODUCT CONTROL

  • Product Control

  • Product
  • Charge

  • Production date

  • Length

  • Width

  • Thickness

  • Curve

  • Flatness

  • 0,2% Strain

  • Tensile stength N/mm2

  • Elongation at break

  • Creep

  • Bending test

  • Finishing

REMARKS

    Remarks
  • Number

  • Defenition remark

NON Conformities

  • Non Conformities

  • NCF
  • Number NCF

  • Defenition NCF

  • Actions for the producer in case of an Non- conformity

  • Corrective actions to Kiwa
  • The company present corrective actions to Kiwa before:

  • Kiwa will check the corrective actions during:

  • Corrective actions have to be presented to Kiwa within one month

  • Corrective actions

  • Judgement on corrective actions Kiwa

SIGN OFF

  • Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.