Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
DOCUMENTS AND PROCEDURES
IQC-schedule
-
Presence and contents of the IQC-schedule
Quality system
-
Quality system actual, documented en introduced
-
Procedures/instructions, documentation and forms (register of documents)
Responsibillities and authorities
-
Description of responsibillities, authorities and the relation between
Managment and tools
-
Description of required tools for Quality assurance
-
Description of qualifications personnel
Realizing products
-
Procedure customer complaints
-
Description of requirements and tolerance raw materials
-
Description of measuring- and control points production process, needed equipment
-
Procedure indentification en tracibillity raw materials and final products
-
Description of storing raw materials and final products
-
Calibration, identification and registration process-, lab- and other equipment
Measuring an analysing
-
Procedure or quality plan for inspection an trail
-
Procedure Non-conform products
-
Procedure and registration corrective actions
Qualification and registration personnel
-
Is there an registration qualification personnel and is it up to date
IMPLEMENTATION
INCOMING MATERIALS
-
Chemical analyses/compositions zinc
-
Chemical analysis alloys
PROCES CONTROL
Melting Furnace
-
Temperature
-
Chemical compositions
-
Chemical compositions
Sample
-
Batchnumber
-
Zn
-
Al
-
Cu
-
Ti
Castinginstallation
-
Temperature Zinc
-
Speed of casting
-
Length block
-
Thickness block
-
Coolsingel water
-
Air
Rollingproces (hot / cold)
-
Adjustments of rolls
-
Speed of the rolling
-
Thickness of zinc
-
Rolling pressure
-
Pull and brakeforce
-
Straightining proces
-
Cutting
-
Stamping
-
Stacking
PRODUCT CONTROL
-
Dimensions
-
Mechanical properties
-
Elongation (after 1 hr / 50 N / mm2)
-
Appearance
-
Finish
CONTROLE STORAGE AND DELIVERY
-
Storage
-
Packing
-
Marking
-
NON Conforming products
-
Loading for transport
COMPLAINTS
-
Handling complaints
CONTROL OF TESTEQUIPMENT
-
Is the test equipment calibrated en registrated
-
Are measuring instruments used from producer
Equipement
-
Defenition
-
ID-number
-
Last calibration
-
Calibration institute en report number
-
Are measuring instruments used from Kiwa
Equipment
-
Defenition
-
ID-number
-
Last calibration
-
Calibration institute en report number
PRODUCT CONTROL
-
Product Control
Product
-
Charge
-
Production date
-
Length
-
Width
-
Thickness
-
Curve
-
Flatness
-
0,2% Strain
-
Tensile stength N/mm2
-
Elongation at break
-
Creep
-
Bending test
-
Finishing
REMARKS
-
Remarks
-
Number
-
Defenition remark
NON Conformities
-
Non Conformities
NCF
-
Number NCF
-
Defenition NCF
-
Actions for the producer in case of an Non- conformity
Corrective actions to Kiwa
-
The company present corrective actions to Kiwa before:
-
Kiwa will check the corrective actions during:
-
Corrective actions have to be presented to Kiwa within one month
-
Corrective actions
-
Judgement on corrective actions Kiwa
SIGN OFF
-
Inspector