Title Page
-
Site conducted
-
Conducted on
-
Prepared by
Inspection
-
Please confirm the compliance check is completed quarterly
-
Have all actions from previous KSR check been closed out
-
Please detail why not
-
Have fire drills been completed for all shifts in the last 12 months (6 monthly for sites with more than 250 personnel)
-
Are daily walk around checks completed for fire escape routes, including combustibles under stair wells and recorded
-
Does the site have a fire escape route check regime in place (doors, signage, illumination, infrequently populated areas including roof voids, fixed ladders etc) that is recorded
-
Has the annual Fire Extinguisher check been completed in the last 12 months
-
Please take photos of 4 fire extinguishers around site showing service sticker.
-
Does the site have fire plan detailing fire doors, extiguishers and escape routes
-
Is the fire alarm tested/ checked weekly and recorded in the site fire log book
-
Are call points checked on a rota basis (each call point at least every 3 months)
-
Can the alarm be heard in all locations
-
List areas the alarm cannot be heard
-
Does the site have sufficient trained competent fire managers/team/marshals
-
Please list numbers per shift/ area
-
Record the service provider last service date. (Must be within 6 months) and confirm fire panel is clear of faults
-
Is there an up to date emergency procedure in place covering all potential emergencies e.g. fire, ammonia, bomb threats
-
Does the site have induction and training in place for emergecny escape and assembly for visitors, agency and own staff
-
Does the site have a monitoring process for MHE and battery condition including combustibles, cables etc in battery areas
-
Are roof void access points restricted and signage preset ref one man toolbox etc
-
Ask members of staff across different shifts what they should do in the event of a fire alarm
-
Please list names of staff questioned
-
Ask members of staff across different shifts what they should do in the event of an Ammonia alarm
-
Please list names of staff questioned
-
Does the site have a composite panel plan and readily available in the emergency pack
-
Are composite panels on a documented (min 3 monthly) inspection and repair regime
-
Is work planned to be carried out which entails breaching composite panels agreed with H&S/Engineering team first
-
Please detail work to be carried
Actions/ Comments
-
Have all actions been added to Key Action Tracker
-
Additional comments
-
Signature