Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

CASH AND CASH EQUIVALENT (10%)

Petty Cash management:

  • Is there any discrepancy on Petty Cash Fund? (Shortage/Overage)

  • Does the use of petty cash comply with the prescribed standards on the audit checklist?

  • Is the liquidation of warehouse petty cash to the head office carried out on time, as per standard?

RPF (Request for Payment Form):

  • Do the warehouse records in the RPF show no discrepancies as per the audit checklist?

  • Are the RPF properly filled out with the appropriate attachments as per the requirements?

  • Were all the requests submitted on time?

  • Were all RPFs liquidated on time?

WAREHOUSE DOCUMENTS STANDARDS (25%)

DR - DELIVERY RECEIPT

  • Is the Physical Delivery Receipt (DR) filed completely?

  • Is the filing of Physical Delivery Receipt (DR) within the established standards?

  • Is the Physical Delivery Receipt (DR) input properly and completely?

  • Are Physical Delivery Receipt (DR) properly and completely encoded in Odoo?

SMF - STOCK MOVEMENT FORM

  • Is the Physical Stock Movement Form (SMF) filed completely?

  • Is the filing of Physical Stock Movement Forms (SMF) within the established standards?

  • Is the Physical Stock Movement Form (SMF) input properly and completely?

  • Are Physical Stock Movement Forms (SMF) properly and completely encoded in Odoo?

BMF - BAD STOCK MOVEMENT FORM

  • Are all Bad Stock Movement Forms (BMF) listed in the following documents:<br>a. Warehouse BO Logs for product damages and conversions?<br>b. Checkers SMF Logs for transferring of stocks?

  • Are Physical Bad Stock Movement Forms (BMF) properly and completely encoded in Odoo?

RRF - RETURN RECEIVE FORM

  • Is the RRF series filed properly and completely?

  • Is the filing of Physical Return Request Forms (RRF) within the established standards?

  • Does every Return Receiving Assessment Slip (RR-AS) have a corresponding Return Request Form (RRF)?

  • Is the Physical RR-AS (Return Receiving Assessment Slip) or RRF (Return Request Form) properly and completely encoded in Odoo?

DCC DAILY CYCLE COUNT/INVENTORY RECONCILIATION

  • Is the Daily Cycle Count (DCC) fully accomplished?

  • Is the Daily Cycle Count (DCC) submitted on time by 9:00 AM each day?

  • Are all SKUs with discrepancies reconciled by 12:00 PM each day, including checking the history of missed SKUs?

  • Are all records in the Daily Cycle Count (DCC) reconciled and updated with the Odoo records?

WAREHOUSE MAPPING

  • Does the actual mapping align with the actual inventory per pile, including placement and inventory?

  • Is each pile color-coded for easy identification and representation on the mapping?

  • Is the mapping updated daily and sent by 12:00 PM?

WAREHOUSE CLEANLINESS AND STANDARDS (25%)

WAREHOUSE STANDARDS

  • One (1) template per brand, per type, vessel code.

  • Each pile must be color coded for easy representation on mapping.

  • All piles must have at least 1 meter distance from walls (Left, Right & Back).

  • Sling bags foundation should have 3 high for foundation before locking. <br>Jumbo bags foundation should have 4 high for foundation before locking<br>Mega bags foundation should have 3 high for foundation before locking.

  • Sling bags maximum stacking must be 6 high. <br>Jumbo bags maximum stacking must be 9 high.<br>Mega bags maximum stacking must be 6 high.

  • Arrangement at the back part must be 3 high foundation for sling and 4 high for jumbo on first 2 rows

  • Must have horizontal counting and running total written at the side of each pile

  • Other part of the warehouse ( Parking Lot, BO area, Rebag area, Resling Area, Sweeping Area) per door

WAREHOUSE CLEANLINESS

  • Is there a staging area/tagging, for items, bad stocks?

  • Warehouse is organized & clean?

INVENTORY RESULT (40%)

Wall-to-wall AUDIT INVENTORY vs DCC (Daily Cycle count) (1 day, less all yesterday's transaction) - Cement Product

  • GOOD STOCKS - No variance?

  • BAD STOCKS - No variance?

Wall-to-wall AUDIT INVENTORY vs DCC (Daily Cycle count) (1 day, less all yesterday's transaction) - Plywood Product

  • GOOD STOCKS - No variance?

  • BAD STOCKS - No variance?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.