Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General
-
Weather conditions?
-
Which water authority will be responsible for works once the maintenance period is over?
-
Which authority accredited contractor has been nominated to complete water reticulation works?
-
Does the water contractor have the correct revision of "issued for construction" drawings on site?
-
Describe the section of works audited with reference to sewer manhole numbers &/or subdivision street names?
-
Is the section of works audited trafficable or non-trafficable?
OH&S
-
Site personnel wear appropriate personal protective equipment as required? I.e high visibility clothing, hard hats & foot ware.
-
Where trench depth exceeds 1.5m Contractor has installed trench shoring or benching as required?
-
Safe access & egress, to & from trenches has been made available for site personnel? I.e ladder or other means.
-
Trenches are fenced off or barricaded when trench is left open?
-
Suitable lifting equipment is available for the works being carried out?
-
Traffic Management has been installed as required?
Water Reticulation Works
-
Commencement of water reticulation works?
-
Water reticulation pipe type being installed is in accordance with design documentation & relevant authority specifications?
-
Are pipes being installed in accordance with design specification and manufacturers recommendations?
-
Are trench widths adequate for pipe size/type? Refer to standard drawing MRWA-W-202 pipe trench details.
-
Is the bedding material installed in accordance with design documentation & standard drawing MRWA-W-201pipeline embedment & trench backfill?
-
Does trench backfill material comply with design documentation & relevant authority standard drawings MRWA-W-201 pipeline embedment & trench backfill?
-
Are required clearances to other services being maintained as per relevant authority specifications?
-
Are thrust restraints being installed as per design documentation where required?
-
Any additional information regarding construction activities?
Status of water authority tests
-
Date swabbing of water reticulation works completed?
-
Date pressure test completed on water reticulation works?
-
Has the water reticulation works passed authority pressure test?
-
Chlorination of water reticulation works completed & results satisfy authority requirements?
-
Any additional information regarding the testing of water reticulation works?
Status of Authority Verification Forms
-
Status of authority Development Deed Document?
-
Status of authority Pre-commencement Verification Form?
-
Status of testing of water reticulation works?
-
Status of authority Construction Verification Form?
-
Status of authority as-constructed verification form?
-
Status of authority EDLP Verification Form?
-
Any additional information regarding the status of Verification Forms?