Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

PRE SITE

  • Pre site safety checklist completed

  • Circuits arranged to suit reasonable maximum demand

NBN AND STRUCTURED CABLE

  • NBN GPO wired in to WSC or TP (Carlisle)

  • TV roof coils located at manhole and link ran to WSC

  • Maintained separation of structured cables from electrical cables

  • All data and comms pipe roughed in (including waps)

  • Cat cable labeled at each end what data point it is.

  • Alarm roughed in and each cable labeled at alarm panel.

  • Keyfob module roughed into garage door motor location

SWITCH BOARD

  • Feeds/mains in switch boards

  • Sub board location as per plan

  • Feeds/mains segregated from gas, water pipes and structured cabling

  • Measurement for sub board noted on plan.

  • Earth bond connected and zinc spray

  • Switchboard cable entry 'slide & cover' reinstalled.

  • Switchboard cable entry point fire guarded.

  • Pole fillers reinstalled

  • Correct cable sizes used for AC and Sep circuits

WALLS

  • N/C measurements on plan

  • All brackets installed

  • Client/plan specific measurements followed.

  • All items as per plan

  • All heights as per plan

  • GPOs in wet areas at minimum heights & minimum clearance.

  • WM GPO as per builder/plan/specs/regs

  • Bathroom/ensuite GPO loop measurements on plan

  • Cables clear of return air void

  • Holes drilled in brace board, maximum 100mm

  • Holes drilled in walls and top plates minimum 300 apart

  • Holes drilled in walls and top plates minimum 300 apart. More than 1.

  • Holes drilled in walls and top plates minimum 300 apart. 3 or more.

  • Holes 300 from bracing

  • Holes 300 from bracing. More than 1.

  • Holes 300 from bracing. 3 or more.

  • 25mm segregation from pipes.

  • 25mm segregation from pipes. More than 1.

  • 25mm segregation from pipes. 3 or more.

  • Oven & cook top wired correctly. Upright/wall oven/induction.

  • Under bench power ran in correct slab conduit & corrugated conduit.

  • Kitchen measurements correct and noted on plan

  • All switches stripped up and earths soldered

ROOF/LIGHTS

  • All light measurements on plan

  • Light measurements not obstructed by building materials or other services

  • Alfresco/balcony/porch measurements off of bricks/cladding

  • Kitchen strip lighting GPO provisions ran in 2.5mm

  • Kitchen strip light/under cupboard lights roughed in correctly. Location and accessibility of cables.

  • 2 ways/3 ways ran correctly

  • Smoke detector locations as per regs

  • Smoke detectors interconnected

  • Cables securely supported on trusses

  • Cables securely supported on trusses, multiple.

  • Switching of lights roughed in as per plan

  • In-roof JB provisions fit off at rough in. Noted on plan.

  • Pendant and fan nogs installed

  • Plug bases fit off

  • Correct exhaust fan measurements

  • Exhaust fans clear of obstructions

  • Roof work in correct location/s

  • Roof work locations marked on plan

  • Exhaust fans and range hood ducted

  • Holes drilled 300mm apart in Joists

  • Holes drilled 300mm apart in Joists. More than 1.

  • Holes drilled 300mm apart in Joists. More than 3.

  • J/B's installed on single ends of Evap, Heater and Light coils.

OUTSIDE

  • Externals drilled out/poked

  • External heights, as per plan.

  • External heights, as per plan. Multiple.

  • External cables clearly labelled with height and location

  • External cables clearly labelled with height and location. Multiple

  • Electrical items clear of down pipes

  • Electrical items clear of down pipes. Multiple.

  • HWS GPO in correct location

  • AC isolator/s in correct location

  • External Vent and Duct locations marked on plan with a measurement for double storey homes

  • Electrical items 1000mm clear of gas meter

  • NBN conduits line up

  • External items taped to a nail in location to be brought through cladding with note labeled on cable (please pull through at this height)

POST SITE

  • Site has been swept up, all rubbish in bin

  • Detailed unfinished report completed

  • Moved items noted on unfinished report

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.