Title Page
-
SITE NAME
-
CONDUCTED ON
-
PREPARED BY
-
PLOT NUMBER
-
1ST FIXED BY
-
LOCATION
Untitled Page
1ST FIX WIRING
-
Cables should be securely fixed to ceilings /joists
-
Cables are securely fixed to and capping provided where applicable
-
Cables are protected where passing through metal, including walls
-
Cables are clearly marked with location/heights where applicable
-
Accessory boxes are installed in all areas
-
Area/plot is left clean and tidy
1ST FIX WIRING TO APARTMENT & COMMUNAL AREAS
-
Sub main cables are installed to their entirety, metal straps and bands where applicable
-
TV cables are installed to their entirety, segregated
-
BT cables are installed to their entirety, segregated
-
Door entry cables installed in correct positions and locations
-
GTC flexi duct or fibre installed correctly without any kinks or breaks
-
Any other cables (specify) installed correctly
1ST FIX VENTILATION
-
MVHR/MEV unit is installed and or flexed up
-
Ducting is installed, and supported in accordance with manufacturers instructions
-
Core holes are drilled in their entirety, no damage to brickwork or render
-
Extract grills or air bricks are installed and connected to ducting
CUSTOMER SALES EXTRAS, AGREED VARIATIONS
-
All customers sales extras installed in correct locations and all are present
-
Additional comments or notes
DOWNLIGHT DIMENSIONS
-
undefined
-
Names