Title Page
-
SITE NAME
-
CONDUCTED ON
-
PLOT NUMBER
-
PHOTO OF FRONT DOOR
-
INSPECTED BY
-
LOCATION
Untitled Page
CCU CHECK LIST
-
Observations in and around ccu cupboard ( Attach photo)
-
Attach image of CCU internally and externally
-
Attach Thermal image of CCU
-
Check that all terminals are correctly tightened the correct torque settings as per manufacturers instructions
-
Attach image of buzzbar showing that all breakers are correctly connected
-
Additional comments if required
-
Names