Title Page
-
Conducted on
-
Prepared by
-
Client / Site
-
Location
-
Document No.
Inspection Findings
Weather & Rainfall
-
Has a cyclone watch been issued for the construction site?
-
Has the Cyclone Preparedness and Response Plan been activated?
-
What is the current response stage?
-
Has the site received rainfall in the past 24 hours up to 9am?
-
Enter qty received in previous 24hrs up to 9am
-
Is water flowing in water courses?
Obtain a turbidity sample from each sample point and record the results. - Refer to the "How to test turbidity guide" for further instruction -
Add media
Take a photograph of the sampling point
Erosion and Sediment Control
-
Are erosion and sediment control measures installed and maintained
-
Take a photo of controls which are in place
-
Are there any gaps or failures in control devices
-
Take a photo of gaps or failures
-
Are gross pollutant traps installed, maintained and clear of debris?
-
Are there any erosion features on road site (eg. head cut, wash out)
-
Take a photo of erosion
-
Is the work staged to minimise the risk of erosion?
-
Is imported fill appropriately stored to prevent runoff?
Heritage, Biodiversity & Biosecurity
-
Have clearing activities taken place today?
-
Was a preclear inspection conducted?
-
Were the Traditional Owners present
-
Were any artefact's discovered?
-
Take a photograph of the artefact.
-
Is the artefact of Aboriginal or European heritage?
-
Add media
-
Did the discovery require works to be stopped for an extended period of time?
-
Was a fauna pre clear inspection conducted?
-
Was any fauna identified which required relocation?
-
Have any native animals been observed around the construction site in the past 24 hours?
-
Provide a brief listing of sightings. Type, qty, location.
-
Is there evidence of pest or weed incursions on site?
-
Has all plant, equipment and materials mobilised to site undergone treatment for biosecurity purposes?
Housekeeping
-
Is all waste stored in appropriate receptacles and removed to the mainland at regular frequencies?
-
Is all plant stored in a suitable area that does not increase the construction footprint?
-
Is there a designated washout area for concrete?
-
Is the washout area lined with plastic to prevent soil contamination?
Hazardous Substances
-
Are substances secured and stored in an appropriately bunded area?
-
Are substances clearly labelled?
-
Are SDS's held onsite for all hazardous chemicals?
-
Are hazardous chemicals disposed off in an off-site facility?
Mobile Plant & Excavations
-
Are all excavations protected from water runoff? (eg bunded or berm to prevent waterflows entering)
-
Is excavated fill stored away from watercourses?
-
Are operating mobile plant free from grease/oil leaks?
-
Is plant and equipment maintained in accordance with manufacturers instructions?
Other Items
Other items
-
Other items inspected?
List additional items inspected below.
-
Add media
Corrective/Preventative Actions
-
Are there items which require corrective or preventative action to be taken?
-
Add media
-
Does the item require immediate action?
-
Does the item require additional resources?
-
Does the item require a long term solution?