Information
-
Work Centre
-
Auditor(s)
- Tony Wulle
- Sam Samaroo
- Todd Rees
- Nenad Jug
- Helio Homen
- Jaswinder Matharu
- Steve Hogg
- Dave Budhram
- Michael Marshall
- Sharon Muongchanh
- Ron Holliday
- Troy Pandoo
- Dennis Nogueira
- Patrick Kennedy
- Carmelia Silva
-
Audit Participant(s)
-
Conducted on
People
-
Has the operator been trained to requirements of the job and is the training matrix updated?
-
Are all personnel using all the posted Personal Protective Equipment?
-
Are containers of chemicals and wastes properly labelled?<br>
-
Is 5s & housekeeping completed/implemented/followed?
-
Is the area free of spills/leaks/stains?
-
Is OWI contained EMS and followed?
-
Where applicable, are forms, checklists (e.g. forklift), logs (e.g. flammable cabinets), etc. properly in use?
Standardisation / Built in Quality
-
Is Error-Proofing Verification performed at prescribed frequency and was it done at the beginning of each shift? <br>Ask operator to perform an error proofing verification.<br>Is correspondent documentation filled out?
-
-
Are test “rabbits” present in the workcell where error-proofing verification is required?
-
Idling procedure compliance?
-
Has there been any quality complaints in the audited area? If “Yes” review Corrective Action
-
Is there a quality alert posted?
-
Are people trained on the alert & has it been signed off?
-
Is the work being performed to the instructions on the alert?
-
Are Inspection Instruction Sheets, Packaging & Labelling Instructions, Operator Work Instructions, Measuring Devices Instruction Sheet signed by Area Shift Supervisors and Managers?<br>
-
Are the work instructions at the work station?
-
Are they being followed and up-to-date (also verify takt time, cycle time)?
-
Are all quality checks being performed to the Inspection requirements including product critical characteristics & documented? Are the requirements being met?
-
Has the process run sheet been verified / Safety Check Sheet / Changeover checklist?
-
Is the first off part present and tagged as per the First-off Procedure?
-
Is FIFO in place and followed at workcell?
-
Are scrap racks / bins present & parts clearly marked & defective parts marked on the scrap sheets?
-
Per Inspection sheet / Control Plan, is gauge available & does have proper calibration stickers?
-
Is there lot traceability on the part/container?
-
Do the labels at the cell / line match the parts being produced?
-
Does the packaging/labeling match the packaging/labeling instructions (photos of containers and labels in the Packaging and Labeling Instruction correspond with what is currently used)?
-
Are the operators adding their employee # on the label or part/containers?
-
Review Top RPN elements from PFMEA
-
Is the communication log ("Black/Red Book") available and completed as required?
-
Reset process followed (reset log filled out, deviation in place when required, for bypass with approval from Quality)
More
Sign-off
-
-
Signature
-
-
-