Conducted on
Safety
-
Required personal protective equipment used
-
Safety Checklist completed
-
Operators know where the Emergency Stop is located
-
Daily safety officer inspection completed
People
-
Personnel trained and on-the-job training records/matrix updated
-
Communication Log available at the workcell and filled out
Part/Product
-
Operator start-up checklist completed for all questions
-
Error proofing verification performed each shift and recorded
-
Work Instructions available in the workcell and followed step-by-step <br>
-
Standard Work Instructions approved/signed by each shift supervisor and Operation Manager (applicable for documents created after November 23, 2018)
-
Standard Work Instructions specify part protection requirements (to prevent fingerprints, contaminants, marks, pinch points, etc.)
-
Inspection Instruction Sheets approved/signed by each shift Supervisor and Quality Manager (applicable for documents created after November 23, 2018)
-
FO completed as per II Sheet and posted at the work station (if required)
-
LO completed as per II Sheet and posted at the work station (if required)
-
All checks specified in that II Sheet are verified and meet specification
-
Gage Instructions approved/signed by each shift Supervisor and Quality Manager (applicable for documents created after November 23, 2018)
-
Packaging and Labeling Instructions approved/signed by each shift Supervisor and Program Engineering Manager (applicable for documents created after November 23, 2018)
-
Packaging and Labeling Instructions followed (correct packaging, skids used)
-
Employee # is applied on container label or part as required
-
Traceability log filled out
-
FIFO followed at the workcell
Process
-
Master Process Sheet, Set-Up sheets, system log sheet, etc. Filled out on each shift and initialed by Set-Up personnel and/or Supervisor
-
Operation/process parameters within specified range and actual values recorded as applicable (i.e. Paint process - gloss level, colour, adhesion, film build, paint viscosity, oven temperature)
-
Checking fixtures, gauges, controllers, pressure gauges, torque guns, scales, etc. have calibration stickers and calibration not overdue
-
Tooling, checking fixtures are identified with customer name/asset #, engineering change Rev. Level/part number
-
Reset/bypass process followed (reset log filled out, deviation issued and signed as required)
Facility
-
5S and housekeeping completed/implemented/followed
-
Containers of chemicals and waste properly identified
-
No evidence of spills/leaks/stains (or proper measures in place if present)
-
Scrap bins/racks present in the workcell and properly identified
Standardization/Build in Quality
-
Press Idling Procedure compliance (applicable to 141 presses)
-
Quality Alert posted and part verification/containment/marking on part is done as specified in the Alert