Information
-
Work Centre
-
Shift
-
Part Number
-
Prepared by
-
Auditor-Enter First Name/Last Name of person completing the audit
-
Audit Participant(s)
-
Type of Audit (Manager or Supervisor)
-
Conducted on
People (S)
-
Are all personnel using all the posted Personal Protective Equipment?
-
Has the operator been trained to the requirements of the job & is the versatility training matrix updated?
-
Does it include temps or contract personnel?
-
Are they on the versatility matrix?
Standardization / Built in Quality (Q,T,C,M)
-
Are the work instructions (JES) for the parts being produced at the station or in binders located at Production boards?
-
Are they being followed? Observe 3 cycles
-
Are the operators aware of the location of the work instructions?
-
Are the alarm limits for part defects posted & mentioned in the standardized work instructions? ( There is to be a posting in the area that indicates once they reach a X# of parts they are to call for support)
-
Are the operators aware of what the alarm limits are?
-
Is there evidence that verification station(s) are used following significant physical damage to equipment when recovery took longer than 24 hours and the quality of the final product was compromised? Check the black communication book for any entries by maintenance or manufacturing engineering, ask the team leader how long the line was down. (MAFACT 2.05 3c)
-
Is there evidence of standardized work instructions (combination table, standardized work chart & job element sheets) available at the verification station(s) for the work being done?
-
Are they being followed & is the training matrix posted & up to date?
-
Has the safety check sheet been verified?
-
Can the operator show you how they do the checks?
-
For error proofing/error detection device verification, are master/boundary samples (red rabbit) available for each customer attachment point? (MAFACT 2.06-3c)
-
Are they in good condition & clearly identified?
-
Are they completed as per the required schedule? (MAFACT 2.06-3c)
-
Are results recorded? Check data back 1 month
-
Do the numbers on the error proofing devices boundary samples match what is on the boundary sample sheet
-
Is the reaction plan available for the error proofing devices (boundary samples) should they not work as intended? (MAFACT 2.06-3c)
-
Are process settings and/or parameters being monitored? Examples are screw gun settings, grease settings. Choose N/A if there is no equipment/parameters to monitor at the line
-
Are the parameters settings in specification?
-
Have the equipment changeover checklists been verified? NOTE: This only applies to equipment changeovers that take longer than 15 min.
-
Is TPM being completed as per the plan/schedule? (MAFACT 3.09-2d)
-
Is there any screwdriving equipment at the line
-
Are we monitoring the torque?
-
Is the calibration sticker up to date?
-
Is the screw torque with in spec-parameters are on first off?
-
Are key severity items being controlled?
-
Are customer interface characteristics documented on a special product matrix & displayed or in a line binder? (MAFACT 2.04 3c)
-
Does the matrix list all, where/how checked, frequency & the way the Customer will use the part? Are the special characteristics indicated LV1/LV2/LV3 for this work centre?
-
Are scrap racks/bins/lock boxes present & parts clearly marked & defective parts marked on the scrap sheets/electronically? (MAFACT 2.02 3d)
-
Are the parts clearly marked?
-
Are the defective parts recorded on scrap sheets or electronically?
-
Are there high occurrences of failures at this line? Describe what you have found
-
Is there lot traceability on the finished good parts? Confirm with Quality location of & type of lot traceability (ie: date code in fishmouth)
-
Do the labels at the line/cell match the parts being produced? (MAFACT 2.02-3d)
-
Are the operators adding their employee # on the label or part? If this is an autopack line choose NA
-
Is the communication log ("Black Book") available and completed as required?
-
Are there entries by maintenance or quality. Verify the last weeks entries in the book to support any quality alerts or maintenance activities.
-
Is the idling procedure available & followed? Verify the shift handover checklist on the communication board (energy reduction)(MAFACT 6.10 1d)
-
Can the team leader show you they are actively engaged in the CI/ employee suggestion program (MAFACT 6.11-2b)
-
What evidence was show to validate their statement? An example would. be a process change or modification through a work order written by that person.
More
-
Have the results of this audit been communicated to the manager/supervisor/team leader? Only notification to 1 required.
-
Name of person communicated results to
-
Why were the results not communicated?
Sign-off
-
Signature
Customer Incidents Follow - Up