Information
-
Audit Title
-
Site
-
Location
-
Contractor/s
-
Conducted on
-
Audit Conducted By
-
Other Personnel Present
-
What is the location of the Subbase to be tested?
-
What plant is being used to proof roll the Subbase?
-
Is the depth of the pavement layer as required as per the design/specification?
-
Is material used in the subbase pavement layer as specified (i.e. 20mm or 40mm Class 3 FCR)?
-
Are levels as required by design?
-
Is the Subbase approved for next layer to commence?
-
Insert photos of soft spots?
-
Contractor to sign:
-
Council Representative to sign: