Job Details
-
Kovia Job number if required.
-
LCX Property/Project job number (if unknown, ask the office)
-
Site Address
-
First Line of address
-
Site risk assessment
-
Conducted on
-
Insulation work completed by
Pre Installation Evidence
Pre Installation Inspection (please be sure photos are clear and in focus)
-
Clear, up close photograph of the front door to include number or name of property.
-
Photo of loft hatch closed
-
Photo of loft hatch open
-
Various photos showing all angles of the loft space, inc. clear photos of the roof felt.
-
Ceiling photos to show all parts of underside of loft area – to identify lighting
-
Bathroom and shower photo (include electric shower cord pull location)
-
Photographs of mechanical ventilation present in all wetrooms
Mid Installation Evidence
Mid Installation (please be sure photos are clear and in focus)
-
Photos of installers insulating loft space (minimum 4)
-
Photos of loft insulation rolls in loft
-
Photos of pipes and tanks being insulated
-
Down lighters being installed if applicable
-
Photos of pipes in loft
-
Photos of tanks in loft
Post Installation Evidence
Post Installation (please be sure photos are clear and in focus)
-
Various photos showing all angles of the loft space insulated
-
Photo of loft hatch- draught proofing
-
Photo of insulated loft hatch
-
What is the new installed insulation thickness
-
Photo of Tape measure showing new installed insulation thickness
-
Photo of insulated pipe work
-
Photo of loft wedges
-
Photo of insulated tank
-
Photo of eave insulation if possible
-
Photo of Downlight Fire rated caps if fitted
-
Photo of Warning notification signs fixed to roof joists
-
Photo of filled out monitoring form pinned in loft (ensure photo is clear, readable & in focus)
-
Photo of loft declaration ( if applicable )
Installation Sign Off
Sign Off
-
Occupant satisfied that all work has been completed and that the area has been left clean and tidy.
-
Occupants Signature
-
Installation Technicians Signature