Information
-
Document No.
-
Housekeeping improvement notice for W4
-
Conducted on
-
Prepared by
Site information
-
Mace W4 , Regent Street, London, W1B 5AD
-
Mace job reference: 27848
Contractor issuing notice on behalf of Mace
-
Leaner Logistics Limited
-
Package reference: LL684
Contractor notice is issued to
-
Request Issued to:
- Dave Adam
- Kevin Marvin
- Arsim Uka
- Roy Parrott
- Matt Ward
- Raymond o'Hagan
- Nigel James
- Danny Sparks
- Lee Wheelan
- Amir Sharizi
- Ralph Maddock
- Terry Mathews
-
Company Issued to:
- Otis
- Schneider
- RI Works
- Careys
- MJL
- Celtic
- Volker
- Putney & Wood
- Houston Cox
- Imperial
- Hares
- Grattes
- GKR
- Szerelmey
- Robore
Contractual Obligation
-
We remind you of your contractual obligation to keep your work area clear of rubbish, materials ect to ensure safe and sufficient working of this contract. To comply with this obligation you are requested to immediately remove your rubbish ect from the following areas and place it in containers provided
Health & Safety Risk
-
In the event of rubbish, materials ect from the above mentioned contractor poses a health & safety risk area will immediately be cleared by Leaner Logistics Limited and the relevant charges will be passed on (Examples of such instances are blocked staircases, blocked fire exit routes ect)
-
Do the items pose an immediate health & safety risk?
Location, photos and details of areas that require improvement
-
LOB
- Roof
- Level 7
- Level 6
- Level 5
- Level 5 - Balcony
- Level 4
- Level 3
- Level 2
- Level 1
- Ground Floor
- Basement 1
- Basement 2
- Site Entrance
- Pit Lane
- Hoarding
-
Pictures
-
POB
- Roof
- Level 4
- Level 3
- Level 2
- Level 1
- Ground Floor
- Link Bridge
-
Add media
-
Admin Max
-
Add media
-
Compounds
- Compound 0
- Compound 1
- Compound 2
- Compound 3
- Compound 4
- Compound 5
-
Pictures
-
Staircases
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
-
Level/ Landing
- B
- BM
- G
- GM
- 1
- 1M
- 2
- 2M
- 3
- 3M
- ROOF
-
Pictures
-
Scaffolding
- LOB North
- LOB South
- LOB East
- LOB West
- POB North
- POB South
- POB East
- POB West
-
Add media
Time frame given to complete improvement notice
-
If you fail to comply with this notice within "selected timeframe below" others will remove it and you will be charged the full cost of the removal operation. Mace will not be held responsible for any damages caused during the cleanup operation
-
Time Frame
- 1 Hour
- 2 Hours
- 3 Hours
- 4 Hours
- 5 Hours
- 6 hours
- 8 Hours
- 12 Hours
- 24 Hours
- 36 hours
- Close of business
Contra Charge Estimate
-
Estimated time and labour required to complete the "improvement notice" should the selected contractor fail to comply with the issued "improvement notice" (This will be used for the contra charge)
-
Labour Required
- Ganger
- Labourer x 1
- Labourer x 2
- Labourer x 3
- Labourer x 4
- Labourer x 5
- Labourer x 6
- Labourer x 7
- Labourer x 8
- Labourer x 9
- Labourer x 10
- Welfare
- Hoist driver
- Forklift driver
- Carpenter
- Logistics Manager
- Scissor Lift Driver
-
Time Required
- 1 Hour
- 2 Hours
- 3 Hours
- 4 Hours
- 5 Hours
- 6 Hours
- 7 Hours
- 8 Hours
- 9 Hours
- 10 Hours
Confirmation of action
-
Add signature
-
Please note: Failure to comply with this notice with this section "signed off" will result in costs still being charged