Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Client Contact

Project Info

  • Possible start date

  • Possible finish date

  • Project duration and mobilisation / enabling works

  • Floor levels the project includes?

  • Client CM

  • Logistics Team required

  • Site working hours

  • No. of operatives at peak

  • No of office staff

Pricing

  • Fixed price for any packages (waste, site setup, etc)?

  • When do they need price back?

  • Scope of works provided?

  • BoQ provided?

Delivery Management

  • DMS required?

  • Loading Bay available?

  • Vertical transport available?

  • Unloading plant available?

  • Impact of project on tenants and local business

  • Our impact on peak hour traffic (vehicle and pedestrian), i.e: pinch points

Logistics - Access & Egress

  • Pedestrian access & egress route

  • Vehicle access route

  • Vehicle height, width, weight and turning restrictions

Logistics - Vertical transport

  • Vertical transport - Goods lift/Hoist?

  • Vertical transport sizes, openings, weight restrictions

  • Route and waiting areas for vertical transport

Site Accommodation & Welfare Facilities

  • SIte Accommodation and Welfare facilities to be provided by us?

  • Site project office - for how many?

  • Trades office - for how many?

  • Security office

  • Induction room

  • Meeting rooms

  • First Aid room

  • Furniture requirements (from our store? - for no. of deliveries) desks, chairs, pedestals

  • Toilets - male and female, existing or new

  • Drying room - lockers, hooks, benches

  • Canteen - for how many?

  • Kitchen

  • Tea point

  • Welfare supplies

  • Cabin setup requirements

Build Spec

  • Ceiling height and requirements per room

  • Walls - drywall, single skin, taped joints, painted white?

  • Doors - Fire (1/2hr FR) and security (3 / 5 lever)

  • Power - accommodation requirements, location of distribution board

  • Ventilation requirements for office, toilets & drying room

  • Water & waste - supply from? waste to location?

  • Lighting requirements

  • Heating requirements

  • Painting and decorating

Logistics - Site Setup

  • Hoarding requirements

  • Herras fencing

  • Barriers

Logistics - Communication

  • Site Radios

Logistics - Plant, Material & Supplies

  • Barriers, barrier tape, spare protection (starter pack)

  • Wet vac

Logistics - Signage

  • Signs around the site and local restrictions

  • Sign boards and IQ boards

Logistics - Drawing requirements

  • Client drawings available?

  • Leaner drawings required?

  • Fire plan

  • Logistics plan

  • Swept path analysis

  • Material storage zones

  • Protection plan

Logistics - Public Highway

  • Parking bay suspension

  • Hoarding licence

  • Road closures

Protection Works

  • Protection works required?

  • Perimeter glazing - layout and distance between mullions

  • Atrium glazing - layout and distance between mullions

  • Soundproof walkway

  • Access route protection for goods and pedestrians

  • Columns

  • Goods lift protection

  • Goods lift lobby protection

  • Pedestrian / Fireman's lift protection

  • Pedestrian lift lobby protection

  • Riser doors

  • Lobby doors

  • Staircase protection - treads, risers, handrail, balustrades

  • Staircases locked off with break glass partition

  • Client advertising restrictions

  • Main lift lobby protection or lock off

  • Existing toilet protection

  • Storage of existing doors and location

  • Photos (condition survey)

Waste Management

  • Waste Management required?

  • Bins - 360L / 660L

  • Skips

  • Compactors

  • Space in Loading Bay

  • Segregation requirements and restrictions

  • Hazardous waste stations and locations

  • BREEAM / LEED / SCAR requirements

  • Spill kits (training)

Pest Control requirements

  • Survey required?

Access Control System

  • Access Control system required?

  • Location?

  • No of operatives on site?

  • Basic System (computer, software, hardware)

  • Tripod turnstile/s

  • Full Height turnstile/s

  • Biometric (hand)

  • Consumables (card, ribbon, ink cartridges)

Security

  • Guards required

  • Shift patterns

  • Evacuation procedure

  • Emergency information board (muster point, contact information, fire/bomb evacuation, first aid, neighbour contact info, emergency services contact info, ground floor escape route plan)

Fire Strategy & Fire Extinguisher supply

  • Fire plan requirements

  • Fire extinguishers per floor

  • Muster point and lollipop system

  • Fire alarm break glass covers - with or without alarm

  • Evacuation plan

Notes

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.