Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Sub Contractor

  • Brief Description of Works

1. SITE SAFETY

  • Is material and tool storage acceptable?

  • Are the working areas clear and tidy?

  • If waste has been produced, has it been disposed of correctly?

  • Are waste areas/skips tidy?

  • Are working areas protected from the public, with clear signage if in public space?

2. HEALTH & SAFETY

  • Are the COSHH storage areas / COSHH handling practices acceptable?

  • Are there spill kits available?

  • If noise is required to be minimised: Is noise being minimised?

  • If dust is required to be minimised: Is dust being minimised?

  • If chemical fumes are required to be controlled: Are chemical fumes being controlled?

  • If vibration is required to be minimised: Is vibration being minimised?

3. FIRST AID

  • Do the sub-contractors have a fully stocked first aid kit onsite?

  • Do the sub-contractors have eyewash kit?

4. FIRE PRECAUTIONS

  • Do the sub-contractors have fire extinguishers onsite and in date?

5. ASBESTOS & SIDS

  • Have operatives completed asbestos awareness training?

  • Are safe systems of work being used?

6. ELECTRICITY

  • If electric tools are being used: Is any 240v usage authorised?

  • If electric tools are being used: Is any 110v set-up good?

  • If electric tools are being used: Are all 110v tools good and PAT tested?

  • If electric tools are being used: Are cables tidy and organised?

  • If Generator is being used: Is generator in good condition?

7. LEAD DRILLER / TECHNICIAN

  • Does the lead sub-contractor understand their responsibilities?

  • If problems have occurred has the lead sub-contractor reported them?

  • Is the lead sub-contractor controlling all on site effectively?

8. SUB-CONTRACTORS PPE

  • Are sub-contractors wearing correct PPE?

  • Do sub-contractors have CSCS cards onsite?

  • Are sub-contractors wearing eye and hearing protection where neccesary?

  • If required, do sub-contractors have emergency PPE avaliable?

9. MACHINES RIGS & LIFTING EQUIPMENT:

  • Does Excavator / Drilling Rig(s) appear to be in good condition?

  • Are Excavator / Drilling Rig service records present?

  • If required: Are LOLER certificates present and in date?

  • Are hand tools and associated equipment in good order?

  • Are the correct tools for the job present?

10. PERFORMANCE

  • Are sub-contractors being courteous and considerate?

  • Have the neighbouring land owners been unaffected?

  • Has work been carried out to a good standard?

  • Are all sub-contractors working in a safe manner with no evidence of horseplay?

11. OVERALL

  • Has the site been left in a tidy manner?

  • If any fuel / hydraulic leaks have occurred, have they been appropriately dealt with?

CONTRACT MANAGEMENT

  • Do any of the above answers require an NMPI Form to be completed?

  • Provide a brief overview of the NMPI to be completed:

  • Written corrections issued?

  • Please provide information below

  • Tool box talk carried out?

  • Attendee

  • Employee
  • Please sign

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.