Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Sub Contractor
-
Brief Description of Works
1. SITE SAFETY
-
Is material and tool storage acceptable?
-
Are the working areas clear and tidy?
-
If waste has been produced, has it been disposed of correctly?
-
Are waste areas/skips tidy?
-
Are working areas protected from the public, with clear signage if in public space?
2. HEALTH & SAFETY
-
Are the COSHH storage areas / COSHH handling practices acceptable?
-
Are there spill kits available?
-
If noise is required to be minimised: Is noise being minimised?
-
If dust is required to be minimised: Is dust being minimised?
-
If chemical fumes are required to be controlled: Are chemical fumes being controlled?
-
If vibration is required to be minimised: Is vibration being minimised?
3. FIRST AID
-
Do the sub-contractors have a fully stocked first aid kit onsite?
-
Do the sub-contractors have eyewash kit?
4. FIRE PRECAUTIONS
-
Do the sub-contractors have fire extinguishers onsite and in date?
5. ASBESTOS & SIDS
-
Have operatives completed asbestos awareness training?
-
Are safe systems of work being used?
6. ELECTRICITY
-
If electric tools are being used: Is any 240v usage authorised?
-
If electric tools are being used: Is any 110v set-up good?
-
If electric tools are being used: Are all 110v tools good and PAT tested?
-
If electric tools are being used: Are cables tidy and organised?
-
If Generator is being used: Is generator in good condition?
7. LEAD DRILLER / TECHNICIAN
-
Does the lead sub-contractor understand their responsibilities?
-
If problems have occurred has the lead sub-contractor reported them?
-
Is the lead sub-contractor controlling all on site effectively?
8. SUB-CONTRACTORS PPE
-
Are sub-contractors wearing correct PPE?
-
Do sub-contractors have CSCS cards onsite?
-
Are sub-contractors wearing eye and hearing protection where neccesary?
-
If required, do sub-contractors have emergency PPE avaliable?
9. MACHINES RIGS & LIFTING EQUIPMENT:
-
Does Excavator / Drilling Rig(s) appear to be in good condition?
-
Are Excavator / Drilling Rig service records present?
-
If required: Are LOLER certificates present and in date?
-
Are hand tools and associated equipment in good order?
-
Are the correct tools for the job present?
10. PERFORMANCE
-
Are sub-contractors being courteous and considerate?
-
Have the neighbouring land owners been unaffected?
-
Has work been carried out to a good standard?
-
Are all sub-contractors working in a safe manner with no evidence of horseplay?
11. OVERALL
-
Has the site been left in a tidy manner?
-
If any fuel / hydraulic leaks have occurred, have they been appropriately dealt with?
CONTRACT MANAGEMENT
-
Do any of the above answers require an NMPI Form to be completed?
-
Written corrections issued?
-
Please provide information below
-
Tool box talk carried out?
-
Attendee
Employee
-
Please sign