Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Faces main quarry

Crest

  • Is there any work activity at crest of face

  • Any loose blocks rock masses or overhangs

  • Is there any cracking

  • Is there water issuing from face

TOE

  • Is there any work activity below the face

  • Catchment bunds in place

  • Signs of rock fall

FACE

  • Any unusual features caves faults

  • Any signs of movement slipage

  • Is there any water issues behind the face

Haul roads

  • Edge potection in place

  • Catchment bunds in place

  • Any signs of significant rock fall

  • Other

Face sinking

Crest

  • Is there any work activity at crest of face

  • Any loose blocks rock masses or overhangs

  • Is there any cracking

  • Suitable edge protection in place

  • Is there any water issues behind face

Toe

  • Is there any work activity at or below the face

  • Catchment bunds in place

  • Signs of rockfall or slips

Face

  • Is there water issuing from the face

  • Any unusual features caves faults

  • Any signs of movement slippage

Haul roads

  • Edge protection in place

  • Catchment bunds in place

  • Any sign of significant rock fall

  • Graded to control pot holes

  • Other

FACE west quarry

  • Is there any cracking

  • Suitable edge protection in place

  • Is there any water issues behind the face

Toe

  • Is there any work activities at below the face

  • Catchment bunds in place

  • Signs of rockfall slips

Face

  • Is there water issuing from the face

  • Any unusual features caves faults

  • Any signs of movement slippage

Haul roads

  • Edge protection in place

  • Catchment bunds in place

  • Any signs of significant rock fall

  • Graded to control pot holes

  • Other

Tip

  • Are there active operations on the tip

Stockpiles

  • Stockpiles closed off where loading taking place

  • Is loading taking place beyond reach of shovel

  • Is suitable edge protection in place

  • Any vertical faces /undercutting developed in stockpiles

Quality

  • Quality of production face material

  • Any stockpiles contaminated

  • Are stockpiles signs in place

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.