Title Page

  • Document No.

  • Audit Title

  • Project Name / Number

  • Subcontractor

  • Conducted on

  • Prepared by

  • Location
  • Personnel

PREVIOUS INSPECTION

  • All Previous Issues Have Been Addressed

MAJOR DEFINABLE SEGMENT OF WORK

  • Work In Progess

  • Related Specification Sections:

PERSONNEL PRESENT

  • Name, Position, Company

Specified Work

  • Is Workmanship Provided Acceptable?

  • Does Baseline Sample of Work Conform to Contract Drawings, Specifications, Submittals, and Shop Drawings?

  • Are Materials on Hand Adequate to Complete Work?

  • Are Quality Control Inspections and Testing Methods Adequate?

  • Are Drawings Posted, and are Shop Drawings Adequate and in Use?

  • Are Safety and Environmental Precautions Adequate?

Verified By

  • Lee Lewis Construction, Inc Superintendent

  • Quality Control / Superintendent of Trade Involved

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.