Information

  • Audit Title

  • Rig Number

  • Conducted on

  • Prepared by

  • Location / Well
  • Personnel

BOP, choke manifold and gas buster

  • 1. properly installed?

  • 2. All Valves on choke manifold in working condition?

  • 3. HCR valve working properly?

  • 4. Casing side pressure gauge tested and working properly?

  • 5. Drill pipe pressure gauge tested and working properly?

  • 6. Drilling standpipe pressure gauge on floor tested and working properly<br>

  • 7. All Valves on Choke manifold function tested by opening up full and closing then one quarter back turn?

  • 8. Accumulator air and electric hooked up and in proper working condition.

  • 9. Flair stack and panic line installed and connections tight.

  • 10. Accumulator Hydraulic Bottle

  • 11. Flex hose 2” Kill line installed and with safety cable

  • 12. Flex hose HCR valve to Choke manifold installed and with safety cable.

  • 14. Cellar covered

  • 13. Hydraulic hoses hook up with no leaks

  • 15. Are all bolts and nut installed on flow line dresser sleeves

  • 16. Check valve installed

  • 17. Is Blind rams open & close handle protected with a locking device.

  • 18. Casing valve closed.

  • Comments:

  • Add media

  • Signature: inspected by

  • On site representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.