Information
-
Title:
-
Rig Manager:
-
Rig #
-
Driller:
-
Supervisor:
-
HSE Tech/inspected by:
-
Spud Date
-
Location/Well
Dog House and Rig Floor Condition
-
1. Handrails properly Installed
-
2. Stairways installed properly and Secured
-
3. Dog house pin and Cotter Pins installed
-
4. Fire Extinguishers in place and tag up to date
-
5. Safety Chains in place, across openings
-
6. Proper Lighting in place with safety cables
-
7. Safety Signs Posted
-
8. Trash can cleaned and change lockers picked up
-
9. Safety Harnesses in place and accessible
-
10. Rig Floor clean and dry with No Slip material in buckets and available
-
11. Drillers Table clean and Clear
-
12. Drinking water available
-
13. Area clean of trash and trip hazards in side doghouse
-
14. Are the rig floor mats installed properly (no gaps) and in good condition?
-
Comments:
Derrick and Substructure Boom/pipe wrangler
-
1. Derrick pinned with Cotter Pins
-
2. All lights working and with safety cables
-
3. Standpipe clamps tightened and safety cables installed
-
4. Top Drive kelly hose connected and secured with Whip Check
-
5. Fall Arrest Working properly
-
6. Winch Line properly installed
-
7. Iron Rough Neck working Properly
-
8. Tong Dies on Iron Rough Neck in working shape (visual inspection)
-
9. Boom Working properly
-
10. Fire Extinguishers in place and tag up to date
-
11. Area under Substructure Clean and Clear from trash or tripping hazards
-
12. Cat Walk Clean and Clear from trash or tripping hazards
-
13. Checked oil on Swivel or Top Drive
-
14. Greased Crown
-
15. Greased ALL grease Fittings
-
16. Inspected sheaves on block and on crown for any damage or bearing problems
-
17. Ground Rods properly installed 6'
-
18. Cellar jet hooked up and working
-
19. Shale jet hooked up and working
-
Drilling line anchor made up with torque wrench (verify no slippage)
-
20. Pipe racks in place and pipe chocked
-
21. 2X4's picked up and stacked together
-
22. Flow line bolts
-
23. Swivel Kelley hose connected and secured
-
24. Pipe Wrangler working and grounded
-
25. Crown o matic functional, working properly
-
Comments:
-
Add media
Pump and Mud Pits
-
1. All handrails installed properly with no damage
-
2. All Stairways installed properly with no damage
-
3. Fire Extinguishers in place and tag up to date
-
4. Eye wash station installed and working properly
-
5.Shale Shakers Working
-
6. Lights all working and safety cables present
-
7. Safety Signs in place
-
8. Vibrating discharge hoses with safety cables, Clamp, Whip chain
-
9. Water Lubrication Installed
-
10. Walkways free from trash and trip hazards
-
11. Ground Rods installed 6'
-
12. Desander and dsiliter working properly
-
13. Degasser working properly
-
14. Mud mixing area clean and material properly stored
-
Comments:
-
Add media
Generator and HPU House
-
1. Properly Grounded
-
2. All Electric plugs installed properly
-
3. Electric line off of Ground
-
4. Proper lighting installed and working
-
5. Area clean of trash and tripping hazards
-
6. Barrels of oil and lubricant arranged neatly and in order to be used.
-
7. Emergency light inside Gen house
-
8. Proper lighting and with safety cables
-
9. Breaker Box door closed
-
10. Batteries in box and covered
-
Comments:
-
Add media
Fuel and Water Tank
-
1. Properly Grounded
-
2. Fire Extinguishers in place and tag up to date
-
3. Electric Motor Hookup
-
4. No Dirty gloves or ropes on pumps
-
5. No Trash in area and no trip hazards
-
6. No Water or Diesel Leaks
-
7. Water Tank
-
8. is upright diesel tank 3rd party
-
9. Containment ditches clean and deep enough, where do they drain
-
10. Proper lighting and with safety cables
-
Comments:
-
Add media
Bunk House and Tool Pushers’ Trailer
-
1. Properly Grounded
-
2. Fire Extinguishers in place and tag up to date
-
3. Trash can outside crew quarters
-
4. Smoking area clean with butt can
-
6. Water and Sewer hookups and no leaks
-
7. Smoke alarms working in living quarters
-
8. Transformer for living quarters grounded
-
9. Crew quarters steps level with hand rails
-
Comments:
-
Add media
General House Keeping
-
1. Trash Cans in Place with Lids by Rig and by all trailers.
-
2. All sensors on rig monitoring system are up and functioning
-
3. All intercoms are working from rig floor to tool pusher’s cabin
-
4. Rig horn working.
-
5. Geronimo Line, Descending Device
-
COMMENTS:
Sign Off
-
COMMENTS:
-
OTHER:
-
Signature of inspector:
-
On site representative