Information

  • Application Number & Address

  • Type of Inspection

  • Result of Inspection

  • Conducted on

  • Prepared by

  • Other personnel on site

  • Email this report to person noted in this report

  • DA Number

  • Development description

  • Owner

  • Contact

  • Form deliver via

  • Builder

  • Contact

  • Inspection Type

Site establishment

  • Builder's sign on site?<br>PCA sign on site<br>

  • Temporary fencing erected

  • Skip Bin on site? Location satisfactory?

  • Add media

Footings

  • Setback from boundary?

  • Cut/fill on site?

  • Layout in accordance with plan?

  • Type

  • Damp proof membrane?

  • Footing Depth?

  • Footing width?

  • Footing width?

  • Beam reinforcement?

  • Slab reinforcement?

  • Reinforcement Lapping

  • Reinforcement edge clearance?

  • Are piered footings being used.? Adequate bearing capacity throughout footing?

  • Wet area set down?

Inspection result

  • Outcome

  • Add media

Structural engineer certification to be submitted

  • For any changes to design;for final certification;structural engineer to inspect site and issue site instruction

  • Further Comment?

  • Inspecting officer

  • Builder/owner

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.