Audit
DA & CC No. OR CDC No.
Are there any outstanding items from previous inspections?
Are environmental controls stated in the development consent installed on site?
Is the building under construction consistent with the consent/certificate including modification?
Do the following components accord with the BCA or manufacturer's specifications?
Subfloors
Subfloor braces
Timber preservative treatment/s including termite protection
Specify type of treatment used
Ant capping or type of termite treatment
Point load/bearing joists
Ventilation
Mechanical connections
Bolted connections
Timber sizes/spans
Solid blocking
Bearers and joists
Floors
Joists
Substrate fixing for membranes
Timber preservative treatment
Timber sizes/spans
Point load/bearing joists
Timber beams
Steel beams
Wall
External bottom plate fastening
Internal bottom plate fastening
Bracing
Brace height
Brace fixing
Crippling of stud
Timber sizes/span
Framing notches/holes
Nail plates
Lintel size/ fixing/ support
Damp proof course/ flashings
Timber preservative treatment
Is roof framing included in this current Inspection?
Roof
Pitch/type
Purlin fixing
Rafter straps/ concealed purlin cleats
Purlin fixings
Ceiling batten fixing
Truss spacing/tie downs
Secondary bracing, ceiling/roof
Does the steel frame comply with the acceptable construction manuals of the BCA for design and installation?
Do window or door openings accord with the consent/construction?
Have relevant conditions of the consent required to be incorporated in the construction of the building, been implemented?
Does the demolition accord with the consent/certificate?
Have relevant BASIX commitments been implemented?
Has relevant evidence been provided to support the use of a material, form of construction or design in accordance with Part1.2 of the BCA?
Applicable
Has the structural steelwork been installed as per structural engineer's design?
Has the structural steelwork been connected and fastened as per structural engineer's design?
Have relevant conditions of the consent required to be incorporated in the construction of the building been implemented?
Has relevant evidence been provided to support the use of a material, form of construction or design in accordance with Part 1.2 of the BCA?
Applicable
Do the following components accord with the BCA or manufacturer's specifications?
Suitable for location
Cavity
Perpends
Width
Cleanliness of cavity
Weepholes
Articulation joints
Fixing straps and tie down systems
Lintels
Damp proof membrane
Wall tiles, size/spacing
Mortar mix
Isolated piers
Flashing correctly installed (windows, doors, roofs, parapets, chimney)
Have relevant conditions of the consent required to be incorporated in the construction of the building been implemented?
Has relevant evidence been provided to support the use of a material, form of construction or design in accordance with Part 1.2 of the BCA?
Result of inspection
Kerry Hunt BPB 1430;Alex Newberry BPB
Critical stage inspection undertaken on behalf of Leichhardt Municipal Council. PO box 7-15 Wetherill e leichhardt www.leichhardt.nsw.gov.au