Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Consent Details
-
DA & CC No. OR CDC No.
Onsite Inspection
-
Are there any outstanding items from previous inspections?
-
Are environmental controls stated in the development consent installed on site?
-
Is the building under construction consistent with the consent/certificate including modification?
Component: Frame
-
Is framework generally in accordance with Timber Framing code? Take photo
-
Do the following components accord with the BCA or manufacturer's specifications?
Sub-floor and Floor framing:
-
Subfloors
-
Add drawing
-
Subfloor braces
-
Timber preservative treatment/s including termite protection
-
Specify type of treatment used<br>
-
Ant capping or type of termite treatment
-
Point load/bearing joists
-
Ventilation
-
Mechanical connections
-
Bolted connections
-
Timber sizes/spans
-
Solid blocking
-
Bearers and joists
-
Floors
-
Joists
-
Substrate fixing for membranes
-
Timber preservative treatment
-
Timber sizes/spans
-
Point load/bearing joists
-
Timber beams
-
Steel beams
Wall Framing
-
Wall
-
External bottom plate fastening
-
Internal bottom plate fastening
-
Bracing
-
Brace height
-
Brace fixing
-
Crippling of stud
-
Timber sizes/span
-
Framing notches/holes
-
Nail plates
-
Lintel size/ fixing/ support
-
Damp proof course/ flashings
-
Timber preservative treatment
Roof Framing
-
Is roof framing included in this current Inspection?
-
Roof
-
Pitch/type
-
Purlin fixing
-
Rafter straps/ concealed purlin cleats
-
Purlin fixings
-
Ceiling batten fixing
-
Truss spacing/tie downs
-
Secondary bracing, ceiling/roof
-
Does the steel frame comply with the acceptable construction manuals of the BCA for design and installation?
-
Do window or door openings accord with the consent/construction?
-
Have relevant conditions of the consent required to be incorporated in the construction of the building, been implemented?
-
Does the demolition accord with the consent/certificate?
-
Have relevant BASIX commitments been implemented?
-
Has relevant evidence been provided to support the use of a material, form of construction or design in accordance with Part1.2 of the BCA?
Component: Structural Steel
-
Applicable
-
Has the structural steelwork been installed as per structural engineer's design?
-
Has the structural steelwork been connected and fastened as per structural engineer's design?
-
Have relevant conditions of the consent required to be incorporated in the construction of the building been implemented?
-
Has relevant evidence been provided to support the use of a material, form of construction or design in accordance with Part 1.2 of the BCA?
Component: Masonry
-
Applicable
-
Do the following components accord with the BCA or manufacturer's specifications?
-
Suitable for location
-
Cavity
-
Perpends
-
Width
-
Cleanliness of cavity
-
Weepholes
-
Articulation joints
-
Fixing straps and tie down systems
-
Lintels
-
Damp proof membrane
-
Wall tiles, size/spacing
-
Mortar mix
-
Isolated piers
-
Flashing correctly installed (windows, doors, roofs, parapets, chimney)
-
Have relevant conditions of the consent required to be incorporated in the construction of the building been implemented?
-
Has relevant evidence been provided to support the use of a material, form of construction or design in accordance with Part 1.2 of the BCA?
Result of inspection
-
Result of inspection
-
PCA signature
-
Kerry Hunt BPB 1430;Alex Newberry BPB
-
Critical stage inspection undertaken on behalf of Leichhardt Municipal Council. PO box 7-15 Wetherill e leichhardt www.leichhardt.nsw.gov.au