Title Page
-
Conducted on
-
Name of manager carrying out audit
-
Name of Safety Rep carrying out audit
-
Is SM in attendance (only required every third month as per schedule)?
General
-
This audit checklist is based on Engineering Procedure HS-A1-WI.3 Appendix 1 issue 03.<br>Before using it, confirm this is the latest version
-
Has the previous monthly workplace inspection been conducted, completed, signed off and any outstanding items transferred to this monthly inspection?
TBN Bay 5 Hangar Floor
-
Are first aid supplies available?<br>Confirm all in date and complete. First aid contents IAW minimum contents checklist IAW HS-A11-WI.1 Appendix 1.
-
Defibrillator - (L07) - In date and weekly inspections carried out.
-
2 x eye wash bottles in TE office.
-
1 x first aid kit in TE office.
-
-
Are break glass fire alarm points easily accessible and free from obstruction and in good working order?<br>Confirm each point.
-
Left hand side - Rear - (L24)
-
Left hand side - Middle - (L20), plus x 1 through doors.
-
Forward - Left hand side - (L11) By door to classrooms 110 and 112.
-
Forward left hand side by roller shutter door.
-
Forward right hand side by roller shutter door.
-
Right hand side forward by coffee machine.
-
Through right hand middle fire door at bottom of stairs.
-
Right hand side - Rear - (R28)
-
Is all fire fighting equipment in date and easily accessible?<br>Confirm each point.
-
Fire point left hand side - (L21) - 1 x Dry Powder Extinguisher.
-
Fire point in left hand fire escape corridor. 1 x Dry Powder Extinguisher.
-
Fire Point left hand side - (L11) - 1 x CO2, 2 x Foam Extinguishers.
-
Fire point forward left hand side - (L07) - 1 x Dry Powder, 1 x CO2 Extinguisher.
-
Fire point, forward left hand side by roller shutter door. 2 x Foam Extinguishers.
-
Fire point, right hand side by roller shutter door. 2 x Foam, 1 x Dry Powder Extinguisher.
-
Forward right hand side. 22kg CO2 extinguisher.
-
Right hand side by TE office. 1 x Foam, 1 x Dry Powder Extinguisher.
-
Through right hand middle fire door. 1 x Foam Extinguisher.
-
Right hand side - rear. 1 x Dry Powder Extinguisher.
-
Right hand side rear - (R28) - 2 x Foam Extinguishers.
-
Are fire door Vision Panels clear and door closing mechanisms operating correctly?<br>Confirm each exit path.
-
Left hand side - Rear - (L24)
-
Left hand side - Middle - (L20) - 5 x doors to outside.
-
Left hand side through wet room, x 1 door.
-
Left hand side to car park x 1 door.
-
Right hand side to car park x 1 door.
-
Right hand side forward to entrance, 2 x doors.
-
Right hand side - Middle - 2 x doors to outside.
-
Right hand side - Rear - (R28) - 1 x door to outside.
-
Are safety Signs correctly displayed?<br>Exit signs. Fire point signs. First aid Signs.
-
Are floors, stairs, fire doors, walkways and evacuation routes free from obstructions and trip hazards?
-
Are welfare facilities clean, tidy, adequate and in good repair?<br>Men's toilet, right hand side.
-
First aid room.
-
Gents toilets.
-
Are electrical installations and appliances free from damage?<br>Wall sockets, plugs and cables free from damage. Test/inspection labels in date (PAT)
-
Are computer workstations set up correctly and DSE assessments completed for individuals classified as users?<br>Recorded in eRa<br>In TE offices.
-
Is all access equipment in good condition and safety features fully functional?
-
Is any defective equipment identified, tagged and reported?
-
Are engineering personnel in the area observed to be following PPE requirements for the area and task they are completing?<br>Mandatory PPE - Safety footwear, Hi-visibility tabards.
-
Are flammable substances adequately controlled and stored correctly?<br>Stored in flammable cabinets. Release labels on items. No aerosol cans/oil tins left on staging/benches.
-
Are all waste oil/fuel containers emptied?
-
Are spill kits adequately stocked?<br>Confirm each location
-
Forward right hand side - (R1)
-
Is mobile equipment kept in a suitable condition?<br>MEWPS, forklift trucks, electric tugs, etc.
-
Are all lights working?
TBN Bay 5, SHeet Metal Workshop
-
Is work equipment in a safe working condition?<br>Sheet metal workshop - pillar drills, grinders, linishers etc - safety guards in place, emergency stops serviceable etc.
-
Are first aid supplies available?<br>Confirm all in date and complete. First aid contents IAW minimum contents checklist IAW HS-A11-WI.1 Appendix 1.
-
2 x eye wash bottles.
-
1 x first aid kit.
-
Is all fire fighting equipment in date and easily accessible?<br>Confirm each point.
-
1 x Foam Extinguisher.
-
Are fire door Vision Panels clear and door closing mechanisms operating correctly?<br>Confirm each exit path.
-
1 x door to corridor.
-
Are safety Signs correctly displayed?<br>Exit signs. Fire point signs. First aid Signs.
-
Are floors, stairs, fire doors, walkways and evacuation routes free from obstructions and trip hazards?
-
Are engineering personnel in the area observed to be following PPE requirements for the area and task they are completing?<br>Mandatory PPE - Safety footwear, Hi-visibility tabards.
-
Are all lights working?
TC1
-
Is the apron area clear of FOD?
-
Is all access equipment in good condition and safety features fully functional?
-
Is mobile equipment kept in a suitable condition?<br>MEWPS, forklift trucks, electric tugs, etc.
-
Is any defective equipment identified, tagged and reported?
-
Is equipment exposed to adverse weather correctly secured/stored?
-
Are engineering personnel in the area observed to be following PPE requirements for the area and task they are completing?<br>Mandatory PPE - Safety footwear, Hi-visibility tabards.
TA1
-
Is the apron area clear of FOD?
-
Is all access equipment in good condition and safety features fully functional?
-
Is mobile equipment kept in a suitable condition?<br>MEWPS, forklift trucks, electric tugs, etc.
-
Is any defective equipment identified, tagged and reported?
-
Is equipment exposed to adverse weather correctly secured/stored?
-
Are engineering personnel in the area observed to be following PPE requirements for the area and task they are completing?<br>Mandatory PPE - Safety footwear, Hi-visibility tabards.
Completion Signoff
-
Additional comments or findings.
-
Additional media if required.
Completion Signoff
-
Signature of manager/nominee confirming inspection checklist is completed.
-
Signature of safety rep if applicable.
-
Signature of senior manager confirming inspection checklist is completed.
-
Send completed checklist to area team manager for review and to ensure findings are addressed and copy yourself.
You will receive a copy of the PDF inspection report. Save this in the appropriate inspection area folder on the management drive, or locally as per local area procedure.