Information

  • Store No:

  • Store Name

  • Installation Date

  • Location
  • Lead Engineer

Pre-Installation Works

  • Schafer cabinet prior to works commencing :

  • Managers office wall above Schafer cabinet prior to works commencing :

  • IT 4.0 cabinets prior to works commencing :

  • Power distribution prior to works commencing :

  • Top of rack prior to works commencing :

Installation Works

  • Schafer cabinet after works complete :

  • Managers office containment above Schafer cabinet :

  • Power and containment above XXL :

  • LAN Switch Picture and Serial Number - Must be in Order
  • LAN Switch Number 1 - Serial Number

WAN Switch Picture and Serial Number - Must be in Order

  • WAN Switch Number 1 - Serial Number

  • WAN Switch Number 2 - Serial Number

  • Front of Lidl XXL Cabinet - Pre Switch, Post Cabling Install

  • Front of Lidl cabinet post switch/AP install :

  • Back of Lidl Cabinet :

  • Front of 3rd Party rack :

  • Back of 3rd Party rack :

  • Front of CCTV rack :

  • Back of CCTV rack :

  • Cabling from XXL to main tray route :

  • Penetration into managers office including seal :

  • Rack labels front & back :

  • Cabling within colo rack :

  • Cabling through rubber grommets (ensure IP rating) :

  • Fan units powered up and cabled correctly with temperature set :

  • Switch cabling neat :

Installation Sign-Off

Installation Sign-Off:

  • LMF

  • Store Contact (CAPITALS):

  • Lead Engineer (CAPITALS):

  • Installation Finish Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.