Title Page
-
Product/item name
-
Batch number
-
Area
-
Conducted on
-
Prepared by
Line Clearance Inspection
Area and Material Inspection
-
Is the area clean, free from previous product and unwanted materials?
-
Is the equipment cleaned properly?
-
Is the temperature and humidity in the production area at the required specification?
-
Are the raw materials used labelled properly? (Material codes, expiry date, etc)
-
Have all samples been removed?
Machine Inspection
-
Are the conveyors clean, free from previous product and unwanted materials?
-
Are the transfer assembly lines clean, free from previous product and unwanted materials?
-
Are the product retainers clean, free from previous product and unwanted materials?
-
Is the foil feed empty, free from previous product and unwanted materials?
-
Has the packaging leaflet feed been dismantled?
-
Has the waste bin been removed and emptied?
Personal Protective Equipment (PPE) Inspection
-
Are there appropriate PPE designated for each personnel?
-
Are the PPE in good condition?
-
Is there a first aid kit present in the area?
Closing Remarks
-
Is the production line ready for setting up the next batch?
-
What else needs to be completed?
-
Overall rating
-
Comments or suggestions
-
Date completed
-
Sign off