Title Page

  • QUA SF 040-1 Rev 2

  • Part Number

  • Part Name

  • Customer

  • Gauge Supplier

  • Gauge Supplier Contact Name

  • Gauge Supplier Contact Phone Number

  • Part Design Source

  • Part Design Source Contact Name

  • Part Design Source Contact Phone Number

Pre Gauge-Build Review

  • CAD Data is correct to present rev level of part

  • GD&T is correct to present rev level of part

  • Team Systems Check Fixture Requirements & Build Guidelines - Communicated

  • Gage size 70 L x 40W x 55H – Communicated (gauge does not meet size criteria – validate annual layout plan)

  • Meet customer specific build requirements - Communicated

  • Do the SPC points match the customer requirements? (Stoplights, QH-P)

  • When possible parts need to be in car position on gauge

Final Gauge Review Checklist

  • Completed fixture is built to the latest E/C level

  • The fixture base is certified & reference body grid lines are properly identified

  • All datums & checks exist & are properly identified as per the gauge design

  • All details are properly painted, or corrosion resistant coated

  • All details are attached to the fixture & properly identified(Including SPC ports)

  • Check for loose dowels, shims (new gauge should not have shims), burrs, dirt between surfaces, etc

  • Check for proper slip fit of locating pins, check pins, slide units, etc.

  • Check for proper & safe function of swing units, templates, etc., (pinch points)

  • Check for proper fit & pivot alignment of clamps to contact surface, (w/ material thickness)

  • Check for proper function, storage & clearance for SPC data collection units.

  • Check for proper storage & identification of style/model change units

  • Certification documentation is provided

  • Certification & revision tags are properly filled out & attached to the fixture and state "Property of" for specific OEM.

  • Tooling number is properly identified on gauge per customer requirements

  • Operator instructions are completed & attached to the fixture.

  • Gauge R checks are completed & documented as per A.I.A.G. guidelines

  • Gauge base has forklift pockets for safe movement of the fixture.

  • Gauge cover covers to bottom of base plate and does not cover fork pockets

  • The fixture is constructed to T.E.A.M. Systems standards (pgs.1-42) in addition to OEM requirements unless otherwise noted.

  • All simulations scribed w/body lines minimum of 50mm & gap/flush specifications are marked at each body line.

  • MicroRidge MC-MM-M3 mini mobile module wireless transmitters, along with the Micro Ridge MC-M3-905538-6 mini mobile module cables for use with the Mitutoyo 543-series for each dial indicators are included.

  • Gauge CAD / Math data supplied or made available via FTP site

Approved By

  • Program Manager:

  • Program Manager Signature:

  • Quality Engineer:

  • Quality Engineer Signature

  • Metrology Lab Representative:

  • Metrology Lab Signature:

  • OEM Representative:

  • OEM Signature:

  • Gauge Supplier:

  • Gauge Supplier Signature:

Fixture Checklist Review

  • 1 Completed fixture is built to the latest tool design revision level.

  • 2 The fixture base is certified & reference body grid lines are properly identified.

  • 3 All datums & checks exist & are properly identified as per the gage design.

  • 4 All details are properly color coded, painted, or corrosion resistant coated.

  • 5 All details are attached to the fixture & properly identified with gage # & detail #

  • 6 Check for loose dowels, shims, burrs, dirt between surfaces, etc.

  • 7 Check for proper slip fit of locating pins, check pins, slide units, etc.

  • 8 Check for proper & safe function of swing units, templates, etc., (pinch points).

  • 9 Check for proper fit & pivot align of clamps to contact surface, (w/ material thickness).

  • 10 Check for proper function & clearance for SPC data collection units. Digital indicators if required marked as to what program they are used for.

  • 11 Check for proper function, storage, & I.D. of apply & style change units.

Approvals

  • Program Manager

  • Program Manager Signature

  • Quality Engineer

  • Quality Engineer Signature

  • Metrology Lab Representative

  • Metrology Lab Representative

  • OEM Representative

  • OEM Signature

Comments

  • Pre Gauge-Build Review

  • Final Gauge Review

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.