Title Page
-
Prepared by
-
Trainee Name
-
Work Cell/Area
-
Select training situation
Introduction
-
Introduction to the department
-
Walk trainee through assigned department review process flow
-
Introduce trainee to area Team Leader
-
Introduce trainee to area Trainer and team
-
Review / explain team board / problem solving board
-
Review customer demand schedule and potential overtime
-
Review OJT system
-
Review training plan
-
Expectations
-
Understand key quality aspects of job (Job specific) - Start Date
-
Understand key quality aspects of job (Job specific) - Completion Date
-
Know and perform autonomous maintenance and CWI process (Job specific) - Start Date
-
Know and perform autonomous maintenance and CWI process (Job specific) - Completion Date
-
Know and perform job within process (Job specific) - Start Date
-
Know and perform job within process (Job specific) - Completion Date
-
Know cycle time and build to them (Job specific) - Start Date
-
Know cycle time and build to them (Job specific) - Completion Date
Operator in Training - Level 1
-
Introduce trainee to rotation plan (If this pertains)
-
Introduce training part / 1st off & last off boundary part (area specific)
-
Introduce trainee to work cells
-
Trainee to read MES / SOS (MES if applicable)
-
Trainee to read JES
-
Trainee watches trainer build (Time trainee watches to be determined by trainer)
-
Trainee reads through SOS / JES / MES again
-
Introduce trimming and flaming techniques (Molding specific)
-
Section Completion Date
Builds with Trainer - Level 2
-
Review training part / 1st off & last off boundary part (area specific)
-
Review cycle time for station hourly rate board
-
Trainee begins building in process until all steps are being performed
-
Trainee will use trainers badge as their own until trainee completes level 3
-
(Steps are introduced in a fashion that the cell maintains achieving posted rates)
-
Section Completion Date
Builds with Quality - Level 3
-
Trainee is performing all job elements, trainer no longer is required in cell
-
(Team Leader can identify training partner to complete remaining steps)
-
Trainee is building in process while maintaining quality expectations
-
Trainer certifies each build before putting in finished goods tote or passing to next station and initials label
-
Section Completion Date
Builds at Rate - Level 4
-
Trainee is building 100% without trainers assistance
-
Trainer can check spot trainees builds (Finished goods still flow through C30)
-
Trainee no longer uses trainers badge, they are issued their own badge
-
Trainee builds rate for 2 hours while maintaining process and quality
-
Section Completion Date
Team Leader's Review
-
Positive feedback
-
Constructive feedback
-
Review day's training with trainee
-
Review trainers comments
-
Review additional training plans (This could include same station or next assignement)
-
Input OJT updates
-
Trainer - Trainee has proven to build at rate while maintaining quality standards
-
Trainee - Trainee is comfortable building alone, making rate while maintaining quality
-
Trainee Signature
-
Team Leader Signature
-
Section Completion Date
Alerts
-
Alert training completed prior to being placed in OJT system (List Alert Numbers)
Production Manager Sign-off
-
Production Manger Name
-
Production Manager Approval
-
Approval Date
Introduction to Department
-
Walk trainee through assigned department and review process flow
-
Introduce trainee to their team and trainer
-
Review and explain team P.R.I.D.E board
-
Review OJT system
-
Review training plan
Training Validation
-
Select a program
-
Select the JL FEM workstation or cell/area
- AGC ST 2
- AGC ST 3
- AGC ST 5
- AGC ST 6
- AGC ST 7
- AGC ST 10
- AGC ST 11
- AGC ST 13
- ECM SUB ASSEMBLY
- ASSEMBLY KITTING
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Select the JT FEM workstation or cell/area
- Carousel 1
- Carousel 2
- Carousel 3
- Carousel 4
- Carousel 5
- Carousel 6
- Carousel 7
- Carousel 8
- ECM Subassembly
- Assembly Kitting
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Select the JL Grille workstation or cell/area
- Station 1 (Rivet)
- Station 2 (Welder)
- Station 5
- Station 6 (Rings/W Clips)
- Station 7 (Textures)
- Station 8 (Screws)
- Poka Yoke (Hood Seal and EOL)
- Texture/Ring Kitting
-
Cycle time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Select the JT Grille workstation or cell/area
-
Cycle time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Select the JL Front Bumper workstation or cell/area
- FPA Assembly
- Station #1A
- Station #1B
- Station #2
- Station #3
- Station #5
- Station #6
- Station #7
- Station #8
- Packout
- Kitting
- Batch Build
- Blow Mold 1
- Blow Mold 2
- Blow Mold 3
- Blow Mold 4
- Blow Mold 5
-
Cycle time (seconds)
- FPA Assembly
- Station #1A
- Station #1B
- Station #2
- Station #3
- Station #5
- Station #6
- Station #7
- Station #8
- Packout
- Kitting
- Batch Build
- Blow Mold 1
- Blow Mold 2
- Blow Mold 3
- Blow Mold 4
- Blow Mold 5
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Select the JT Front Bumper workstation or cell/area
- FPA Assembly
- Station #1A
- Station #1B
- Station #2
- Station #3
- Station #5
- Station #6
- Station #7
- Station #8
- Packout
- Kitting
- Batch Build
- Blow Mold 1
- Blow Mold 2
- Blow Mold 3
- Blow Mold 4
- Blow Mold 5
-
Cycle time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Select the JL Rear Bumper workstation or cell/area
- RPA Cell
- Station #1/Kitting
- Station #3
- Station #4
- Station #5
- Station #6
- Station #7
- Packout
- Rear Blow Mold
-
Cycle time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Select a press
- Press #1
- Press #2
- Press #3
- Press #4
- Press #5
- Press #6
- Press #7
- Press #8
- Press #9
- Press #10
-
Program:
-
Select station to audit
- Dock
- Top Hat
- Green Route
- Bumper Turret
- White Route
- FEM Turret
- JL Picker
- Blue Route
- North Driver
- JT Picker
- Pink Route
- Yellow Route
-
Select station to audit
-
Select a JL/JT Carrier station
- Rivnut Station 1
- Rivnut Station 2
- Turntable Station 3
- Turntable Station 4
- Turntable Station 5
- Turntable Station 6
- Compression Limiter 1
- Compression Limiter 2
- Compression Limiter 3 (LWR Rivnut)
-
Cycle time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
-
Cycle Time (seconds)
Pass/Fail Questions
-
Where is your SOS/JES located?
-
Where are your CWI sheets located?
-
Do you understand what a non-conforming part is?
-
Who has the authority to perform a by-pass?
-
Can team member recite the process back verbally?
-
What risk does double hitting a fastener with the torque gun pose?
Operator in Training - Level 1
-
Introduce trainee to ergo rotation plan (If this pertains)
-
Introduce training part / 1st off & last off boundary part (area specific)
-
Introduce trainee to work cells
-
Trainee to read MES / SOS (MES if applicable)
-
Trainee to read JES
-
Trainee watches trainer build for 15 minutes
-
Trainee reads through SOS / JES / MES after observation period
-
(Repeat previous two steps three times)
-
Introduce trimming and flaming techniques (Molding specific)
-
Section Completion Date
Builds with Trainer - Level 2
-
Review training part / 1st off & last off boundary part (area specific)
-
Review cycle time for station hourly rate board
-
Trainee begins building in process with trainer assistance on all builds.
-
(Steps are introduced in a fashion that the cell continues to achieve posted hourly rates)
-
This process is repeated until trainee has full understanding of all of the requirements within the rotation.
-
Section Completion Date
Builds with Quality - Level 3
-
Trainee is performing all job elements on their own
-
Trainee is building in process, following standardized work, while ensuring all quality attributes for the station are being followed.
-
Trainer certifies each build before placing part in finished goods tote or passing on to the next station.
-
Section Completion Date
Builds at Rate - Level 4
-
Trainee is building 100% without trainers assistance
-
Finished goods still flow through C30 where applicable
-
Trainee successfully builds (6) parts at specified rate
-
Trainee successfully builds at rate for 2 hours with zero defects
-
Section Completion Date