Title Page
-
Location
-
Prepared by
-
Conducted on
-
Area
-
Rolling Mill Heat
-
Coil Number
-
Grade
- HiC
- CHQ
- Boron Grades
- IQ
- Welding Wire
- Wool Wire
- Plating
- Mesh
-
Size
- 7/32
- 15/64
- 1/4
- 17/64
- 9/32
- 19/64
- 5/16
- 21/64
- 11/32
- 3/8
- 13/32
- 7/16
- 15/32
- 1/2
- 17/32
- 9/16
- 19/32
- 5/8
- 21/32
- 11/16
Check Sheet
-
Instructions:
1. Tap “Stage of Process” to start the process inspecting.
2. Select response to identify the type of defect.
3. Tap the camera icon or “Image” to add photos of the defect and annotate the photos to clearly locate the defect. -
4. Keep tapping “add Product” to check for more defects in the same stack/heat/coil.
5. Write additional observations, sign off with a digital signature and tap “save & close” to complete the check sheet and automatically share all recorded quality control data to members of your organization.
Stage of Process
-
Charging Table - Billet tracking
-
Reheating Furnace
- Low reheating temperature
- High reheating temperature
- Correct temperature
- Billets reheated more than 5 hours
- Billets with correct reheating time
-
Mill
-
STELMOR
-
Inspection Station
-
Trim Station
-
Compactor
-
Tag Station
-
Is follow up required?
-
-
Was an employee observed?
Sign Off
-
-
Additional Observations
-
Observer