Information
-
Work Activity No.
-
Activity Type (eg Sewer Clearance, Water main repair)
-
Client
-
Audit Conducted by
-
Conducted on
-
Location of audit
Activity Details
-
Work Area
-
Lend Lease Direct or Contractor
-
Crew Names
Person
-
Company Name
- 4 Civil Solutions
- AMT Excavations
- Bannan Excavations
- Blue Alliance
- Bodsworth Excavations
- Brennan Asset Services
- CJ McDonald Excavations
- CJP Bros
- CSA Specialised Services
- DJ Excavations
- Do All Drainage
- Donnaz Underground
- Eastys Landscaping
- Fastlift
- Fenby Maintenance
- Gem Pipelines
- JK Excavations
- L Boyd Excavation
- L&J Ridgeway
- L&K Earthworks
- L&R Trucking
- Lightowlers
- Mark & Jay Plumbing & Excavation
- M&L Drainage
- MJA Maintenance
- Phil's Water
- Platinum Excavations
- RBM Plumbing and Drainage
- Reservoir Maintenance Contractors
- Stop Tap King
- Stows Waste Management
- Supersafe (Dunny's R Us)
- The Drain Man
- Toxfree
- Waterboy
- Water 2 Go
- OTHER
-
Name:
-
Vehicle / Plant Information
Equipment
-
Vehicle/Plant Rego (or ID Number):
-
Please add photo of vehicle/plant
People
-
Crew Member Details
Crew Member
-
Name
-
Does crew member have current photo ID card onsite?
-
Does crew member have current YVW e-Induction card onsite?
-
Are you verifying crew member competencies?
-
Does crew member have correct and current vehicle licence?
-
Does crew member have current plant operator competency?
-
Does crew member have current Traffic Management competence?
-
Does crew member have current Confined Space competence?
-
Does crew member have current competence in Removing Non-Friable Asbestos (Class B)?
-
Does crew member have current Height Safety Awareness competence?
-
Does crew member have current Radiation Awareness competence?
-
Does crew member have current Hazardous Substance Awareness competence?
-
Are you verifying PPE worn by the crew member?
-
Steel Capped Boots
-
Steel Capped Gumboots
-
High Visibility / Long-sleeved Top
-
Long pants or overalls
-
Helmet (<2yrs old)
-
Safety Glasses or Goggles being worn
-
Protective gloves available and worn during manual handling activities
-
Sun protection available and worn as required (Sunscreen/Wide Brimmed hat)
-
Hearing Protection available (being worn in high noise situations)
H&S Risk Compliance
Pre-activity commencement / Administration
-
Has job pre-start been completed prior to commencing work?
-
Have you signed on to the pre-start?
-
Have the crew identified all relevant site hazards and any appropriate controls?
-
Is the relevant activity SWMS/JSEA available onsite and current?
-
Is the standard Work Procedures for the work being conducted available onsite and current?
Chemical and Compressed Gas Safety
-
Check the currency of MSDS' of any chemicals being used or transported on the vehicle - are the most current available to the crew onsite?
-
Are all fuels, oils and chemicals in clearly labelled containers and stored correctly?
-
Are all gas cylinders stored in an upright position and secured from unintended movement?
Electrical Safety
-
Is electrical detection Voltage Stick available and in working condition?
-
Are all electrical leads inspected and tagged?<br>(Note: LLS Water has adopted a 6-month inspection frequency)
Env Risk Compliance
-
Are silt traps (sediment traps) in good, usable condition and correctly placed?
-
Does vehicle have a spill kit available to deal with hydraulic oil or fuel spills?
Worksite Traffic Management
-
Are you auditing traffic management setup?
-
Has an Approved specific Traffic Management Plan (TMP), Mud Map or generic traffic control plan been provided and available for inspection?
-
Have all crew, signed the traffic management plan in use?
-
Is TMP relevant for the work, including details of any modifications marked and indicated on plan.
-
Are all signs and devices installed in accordance with the Traffic Management Plan?
-
Are all traffic controllers wearing appropriate PPE, Helmets, Vest, Safety Boots, Safety Glasses & Gloves?
-
Have all Traffic controllers been briefed on job requirements and TMP?
-
Have job rotation / relief breaks been considered?
-
Are clearances between workers and adjacent traffic being maintained?
-
Are work zone speed limits in place and determined as per code guidelines?
-
Speed limit / lane closure approval (MOA) form on site?
-
Are the signs in pairs where needed? <br>(Speed restriction signage is required on both sides of the road for high speed volume roads)
-
Are signs placed in all approach roads?
-
Has possible traffic congestion been considered and steps taken to avoid it?
-
Are Flags (orange) installed on all multi-message signs to warn road users?
-
Have measures been taken to remove/cover any contradictory, distracting or unnecessary signs or markings?
-
Are signs suitably placed with regard to sight distance?
-
Are signs suitably placed with regard to motorists approaching at high speed?
-
Are signs suitably placed with regard to queue lengths?
-
Are signs suitably placed with regard to visibility, shade and light glare?
-
Are all signs displayed for current conditions?
-
Are Signs/Bats free of damage / defects or Non-Reflectivity?
-
Have Pedestrian, Cyclist and the Disabled needs been considered?
-
Are Pedestrian, Cyclist and the Disabled needs effective?
-
Stop/Slow bats at hand.
-
Are containment fences / no go zones required and installed?
-
Are containment fences / no go zones effective?
-
Is there adequate access to adjoining properties including side roads?
-
Are Beacons fitted and being operated on the vehicle?
-
Are trailer or vehicle mounted flashing arrows in use where necessary?
-
Job sheets on site and are being completed accurately?
Quality and Work Practice Compliance
Work Practices
General
-
Has YVW response times been met?
-
Are current YVW signs displayed?
-
Has an exclusion zone been delineated around the work site?
-
Has repair methodology been assessed to ensure long-term effectiveness?
-
Are appropriate manual handling techniques or mechanical lifting methods being utilised?
-
Have approved products been used?
-
Has the Control Room been advised of any potential environmental hazards? (eg Sewer Spills, flooding)
-
Have drains and gutters been cleared and unblocked?
-
Has approved back filling been completed and the necessary compaction occurred?
-
Has all excess material been removed from site?
-
Has loaming and seeding been completed?
-
Has the site been left clean, tidy and safe?
-
Have the appropriate customer contact cards been left?
Water Activity Audit
Water
-
Are silt/sediment traps in good condition and installed correctly?
Water Mains and Fittings activities
-
Have water mains been flushed to clear dirty water?
-
Was a deflector used where required?
-
Have all valves been returned to normal operating positions?
-
Have fittings and pipework been wrapped as required?
-
Have new/replaced assets been marked appropriately? (eg Cats eyes installed, road markings painted)
-
Have critical users &/or key customers been identified and catered for?
-
Have valves been isolated to ensure minimal shut off area affected?
-
Where water mains supply is interrupted; has a tap on hydrant been fitted and a Tap on Hydrant sign displayed?
-
Is bottled water available for customer use?
-
Will water supply be restored within required time frames? (Or has water supply been restored within required time frames?)
Water Services, Stop Taps and Meters
-
Is electrical protection equipment available for water service repair work? (and is it being used if service repair being conducted)
-
Is equipment in good working order?
-
Are personnel appropriately trained in use of protective equipment?
-
Sewer Activity Audit
Sewer Activity
Sewer
-
Note Confined Space Entry requirements are listed under the Section titled "Confined Space Compliance"
-
Is there adequate onsite facilities for protecting personal hygiene (eg washing facilities, disinfectant)?
-
Are fall protection measures (eg Manhole inserts) in place to prevent unauthorised access to sewer network assets?
-
Have sediment traps or other containment methods been used to prevent uncontrolled sewer spills?
-
Has the area been disinfected and solids removed to protect public health?
-
Have manhole, I.O or B.T covers been replaced in a flat, level condition?
Public Health Safeguards
-
Are tools and equipment appropriately colour marked?<br>(Colour code: Blue for Water, Red for Sewer)
Excavation
-
Are you auditing the excavation process onsite?
-
In relation to questions marked "(P)" in the following sections, these apply to Planned Works Only. Planned works are defined as activities issued with at least a 4 day lead time.
Planning
-
Permits/Consents current and onsite? (P)
-
Regulatory Authority notified of planned works >1.5m deep (Vic Only) (P)
-
Dial-Before-You-Dig (Asset Location) plans onsite (P)
-
Residents of area notified of potential disruptions (access, noise, dust, services) (P)
-
Overhead lines located, noted and reviewed with the operator
-
Non-destructive asset location undertaken
-
Pre-start Work Method Statement completed and signed by all workers onsite
-
Emergency rescue/response planned and understood by all personnel onsite
Personnel
-
All workers have been appropriately trained and are competent to perform their task
-
Competent electrical spotter in control of excavation where excavator in use within 6.4m of overhead powerlines (up to 66kV)
-
Competent person (trenches/excavations) in charge of excavation<br>(A competent person is a holder of a Certificate in Trench/Shoring Safety or Mine Managers Permit)
Excavation
-
Excavation secured to prevent unauthorised access during activity
-
Are excavation edges protected by barricade/fencing at least 900mm high
-
Excavation entry points clearly sign-posted
-
Spoil kept at least 0.5m from edge of excavation
-
Spoil stored on downhill side of excavation (where applicable)
-
The possible effects of machinery, vehicles or other sources of vibration are controlled
-
Appropriate system of safety (battering, benching or shoring) being used
-
If benching, are bench heights kept lower than the bench width
-
Are un-shored trench walls at an overall slope of less than 45 degrees
-
Safe means of access/egress provided
-
If ladders are used, do ladders extend at least 1m above edge
-
If ladders are used, are they spaced at regular intervals, corners or intersections
-
Fall restraint/arrest been provided for deep excavations
-
Mechanical ventilation or atmospheric monitoring equipment available and in use for deep excavations or potentially contaminated atmospheres
-
Unattended excavations secured to prevent third party access out of hours
-
Electrical Pole-holder in place where excavations are adjacent to power poles and deeper than 1m.
Equipment
-
Plant specific pre-start inspection completed on powered excavation equipment
-
Powered excavation equipment operating outside limits of approach of existing assets
-
No visible damage to structural members of excavation support
Environment
-
Personnel wearing appropriate hearing protection near operating equipment
-
Noise levels of operational equipment within limits <br>(Please see local council, EPA and local safety authority requirements)
-
Surface water or runoff diverted /controlled to prevent accumulation in the excavation
-
Measures in place to prevent site erosion
-
Plant wash down area established and in use to prevent seed/pathogen spread (P)
-
Oil/Fuel spill response kits and trained personnel onsite
-
Acid Sulphate soil management plan available, understood and implemented
-
Workers aware of Indigenous and European-built cultural heritage issues and response requirements (P)
Vehicle and Plant Compliance
Vehicles
-
Has the daily log book / Pre-start inspection checklist been completed for all vehicles onsite?
-
Has a Risk Assessment been conducted for all vehicles onsite?
-
Are all vehicles in good working order, clean and correctly identified?
-
Are current maintenance records for all vehicles available?
-
Are all Fire Extinguishers tagged and current (inspection regime 6 monthly) and sticker prominently displayed on vehicles?
-
Are first aid kits available with contents in date and sticker prominently displayed on vehicles?
-
Is the vehicle equipped with disinfectant and disposal facilities for contaminated waste including Asbestos Containing Waste Material?
-
Are there no tools or equipment stored on the roof or service body of the vehicle?
Mobile Plant and Equipment
-
Has the daily log book / Pre-start inspection checklist been completed for all plant onsite?
-
Has a Risk Assessment been conducted for all mobile plant onsite?<br>(Stickers on contractor plant and in date)
-
Are all trailers and mobile plant in good working order, clean and correctly identified?
-
Are current maintenance records for all mobile plant available?
-
Does the mobile plant have (1) Flashing Beacon, (2) Reversing Beeper and (3) Seat Belts fitted and used?
-
Are decals indicating crush points prominently displayed on mobile plant (both sides of excavator arm)?
-
Are safety clips on compressor hoses being used?
-
Are all chains and lifting equipment in good condition, tagged and in date?
-
Are all Fire Extinguishers tagged and current (inspection regime 6 monthly) and sticker prominently displayed on mobile plant?
-
Are first aid kits available with contents in date and sticker prominently displayed on mobile plant?
Confined Space Compliance
-
Is confined space entry being undertaken?
-
Is the access/CSE permit system being observed and completed correctly?<br>(Is the Work Order number being used, is there a valid Emergency Contact other than 000?)
-
Is there an emergency rescue plan onsite?
-
Do all members of the CSE team onsite have valid CSE tickets?
-
Are all Harnesses/Lifelines inspected, tagged and in good condition?<br>(Inspection regime is currently 6 monthly)
-
Is the Confined Space Entry procedure onsite and available?
-
Has an exclusion zone been established around the confined space?
-
Are all appropriate control measures in place and protection measures being observed for Fall from Heights risks?
Asbestos Removal Compliance
-
Is Asbestos Cement pipework repair or removal work being undertaken?
-
PVC or disposable rubberised gloves available and worn for all persons handling the Asbestos Cement containing product?
-
Class P2 masks available for all persons on site (min. 2 pairs)
-
Warning signage displayed during any cutting operations?
-
Is appropriate clothing / disposable coveralls (x2 pair) available for work or currently being worn?
-
Are adequate hygiene / washing facilities available for the crew?
-
Sufficient number of Asbestos Waste bags and wide grey tape available for double wrapping of waste material (or has sufficient numbers been used if material already bagged)?
Completion
-
Site Audit Leader Name
-
Site Audit Leader Signature
-
Time Audit Competed
Audit Team Members
-
Team Member Name