Information

  • Work Activity No.

  • Activity Type (eg Sewer Clearance, Water main repair)

  • Client

  • Audit Conducted by

  • Conducted on

  • Location of audit

Activity Details

  • Work Area

  • Lend Lease Direct or Contractor

  • Crew Names

  • Person
  • Company Name

  • Name:

  • Vehicle / Plant Information

  • Equipment
  • Vehicle/Plant Rego (or ID Number):

  • Please add photo of vehicle/plant

People

  • Crew Member Details

  • Crew Member
  • Name

  • Does crew member have current photo ID card onsite?

  • Does crew member have current YVW e-Induction card onsite?

  • Are you verifying crew member competencies?

  • Does crew member have correct and current vehicle licence?

  • Does crew member have current plant operator competency?

  • Does crew member have current Traffic Management competence?

  • Does crew member have current Confined Space competence?

  • Does crew member have current competence in Removing Non-Friable Asbestos (Class B)?

  • Does crew member have current Height Safety Awareness competence?

  • Does crew member have current Radiation Awareness competence?

  • Does crew member have current Hazardous Substance Awareness competence?

  • Are you verifying PPE worn by the crew member?

  • Steel Capped Boots

  • Steel Capped Gumboots

  • High Visibility / Long-sleeved Top

  • Long pants or overalls

  • Helmet (<2yrs old)

  • Safety Glasses or Goggles being worn

  • Protective gloves available and worn during manual handling activities

  • Sun protection available and worn as required (Sunscreen/Wide Brimmed hat)

  • Hearing Protection available (being worn in high noise situations)

H&S Risk Compliance

Pre-activity commencement / Administration

  • Has job pre-start been completed prior to commencing work?

  • Have you signed on to the pre-start?

  • Have the crew identified all relevant site hazards and any appropriate controls?

  • Is the relevant activity SWMS/JSEA available onsite and current?

  • Is the standard Work Procedures for the work being conducted available onsite and current?

Chemical and Compressed Gas Safety

  • Check the currency of MSDS' of any chemicals being used or transported on the vehicle - are the most current available to the crew onsite?

  • Are all fuels, oils and chemicals in clearly labelled containers and stored correctly?

  • Are all gas cylinders stored in an upright position and secured from unintended movement?

Electrical Safety

  • Is electrical detection Voltage Stick available and in working condition?

  • Are all electrical leads inspected and tagged?<br>(Note: LLS Water has adopted a 6-month inspection frequency)

Env Risk Compliance

  • Are silt traps (sediment traps) in good, usable condition and correctly placed?

  • Does vehicle have a spill kit available to deal with hydraulic oil or fuel spills?

Worksite Traffic Management

  • Are you auditing traffic management setup?

  • Has an Approved specific Traffic Management Plan (TMP), Mud Map or generic traffic control plan been provided and available for inspection?

  • Have all crew, signed the traffic management plan in use?

  • Is TMP relevant for the work, including details of any modifications marked and indicated on plan.

  • Are all signs and devices installed in accordance with the Traffic Management Plan?

  • Are all traffic controllers wearing appropriate PPE, Helmets, Vest, Safety Boots, Safety Glasses & Gloves?

  • Have all Traffic controllers been briefed on job requirements and TMP?

  • Have job rotation / relief breaks been considered?

  • Are clearances between workers and adjacent traffic being maintained?

  • Are work zone speed limits in place and determined as per code guidelines?

  • Speed limit / lane closure approval (MOA) form on site?

  • Are the signs in pairs where needed? <br>(Speed restriction signage is required on both sides of the road for high speed volume roads)

  • Are signs placed in all approach roads?

  • Has possible traffic congestion been considered and steps taken to avoid it?

  • Are Flags (orange) installed on all multi-message signs to warn road users?

  • Have measures been taken to remove/cover any contradictory, distracting or unnecessary signs or markings?

  • Are signs suitably placed with regard to sight distance?

  • Are signs suitably placed with regard to motorists approaching at high speed?

  • Are signs suitably placed with regard to queue lengths?

  • Are signs suitably placed with regard to visibility, shade and light glare?

  • Are all signs displayed for current conditions?

  • Are Signs/Bats free of damage / defects or Non-Reflectivity?

  • Have Pedestrian, Cyclist and the Disabled needs been considered?

  • Are Pedestrian, Cyclist and the Disabled needs effective?

  • Stop/Slow bats at hand.

  • Are containment fences / no go zones required and installed?

  • Are containment fences / no go zones effective?

  • Is there adequate access to adjoining properties including side roads?

  • Are Beacons fitted and being operated on the vehicle?

  • Are trailer or vehicle mounted flashing arrows in use where necessary?

  • Job sheets on site and are being completed accurately?

Quality and Work Practice Compliance

Work Practices

General

  • Has YVW response times been met?

  • Are current YVW signs displayed?

  • Has an exclusion zone been delineated around the work site?

  • Has repair methodology been assessed to ensure long-term effectiveness?

  • Are appropriate manual handling techniques or mechanical lifting methods being utilised?

  • Have approved products been used?

  • Has the Control Room been advised of any potential environmental hazards? (eg Sewer Spills, flooding)

  • Have drains and gutters been cleared and unblocked?

  • Has approved back filling been completed and the necessary compaction occurred?

  • Has all excess material been removed from site?

  • Has loaming and seeding been completed?

  • Has the site been left clean, tidy and safe?

  • Have the appropriate customer contact cards been left?

  • Water Activity Audit

Water

  • Are silt/sediment traps in good condition and installed correctly?

Water Mains and Fittings activities

  • Have water mains been flushed to clear dirty water?

  • Was a deflector used where required?

  • Have all valves been returned to normal operating positions?

  • Have fittings and pipework been wrapped as required?

  • Have new/replaced assets been marked appropriately? (eg Cats eyes installed, road markings painted)

  • Have critical users &/or key customers been identified and catered for?

  • Have valves been isolated to ensure minimal shut off area affected?

  • Where water mains supply is interrupted; has a tap on hydrant been fitted and a Tap on Hydrant sign displayed?

  • Is bottled water available for customer use?

  • Will water supply be restored within required time frames? (Or has water supply been restored within required time frames?)

Water Services, Stop Taps and Meters

  • Is electrical protection equipment available for water service repair work? (and is it being used if service repair being conducted)

  • Is equipment in good working order?

  • Are personnel appropriately trained in use of protective equipment?

  • Sewer Activity Audit

  • Sewer Activity

Sewer

  • Note Confined Space Entry requirements are listed under the Section titled "Confined Space Compliance"

  • Is there adequate onsite facilities for protecting personal hygiene (eg washing facilities, disinfectant)?

  • Are fall protection measures (eg Manhole inserts) in place to prevent unauthorised access to sewer network assets?

  • Have sediment traps or other containment methods been used to prevent uncontrolled sewer spills?

  • Has the area been disinfected and solids removed to protect public health?

  • Have manhole, I.O or B.T covers been replaced in a flat, level condition?

Public Health Safeguards

  • Are tools and equipment appropriately colour marked?<br>(Colour code: Blue for Water, Red for Sewer)

Excavation

  • Are you auditing the excavation process onsite?

  • In relation to questions marked "(P)" in the following sections, these apply to Planned Works Only. Planned works are defined as activities issued with at least a 4 day lead time.

Planning

  • Permits/Consents current and onsite? (P)

  • Regulatory Authority notified of planned works >1.5m deep (Vic Only) (P)

  • Dial-Before-You-Dig (Asset Location) plans onsite (P)

  • Residents of area notified of potential disruptions (access, noise, dust, services) (P)

  • Overhead lines located, noted and reviewed with the operator

  • Non-destructive asset location undertaken

  • Pre-start Work Method Statement completed and signed by all workers onsite

  • Emergency rescue/response planned and understood by all personnel onsite

Personnel

  • All workers have been appropriately trained and are competent to perform their task

  • Competent electrical spotter in control of excavation where excavator in use within 6.4m of overhead powerlines (up to 66kV)

  • Competent person (trenches/excavations) in charge of excavation<br>(A competent person is a holder of a Certificate in Trench/Shoring Safety or Mine Managers Permit)

Excavation

  • Excavation secured to prevent unauthorised access during activity

  • Are excavation edges protected by barricade/fencing at least 900mm high

  • Excavation entry points clearly sign-posted

  • Spoil kept at least 0.5m from edge of excavation

  • Spoil stored on downhill side of excavation (where applicable)

  • The possible effects of machinery, vehicles or other sources of vibration are controlled

  • Appropriate system of safety (battering, benching or shoring) being used

  • If benching, are bench heights kept lower than the bench width

  • Are un-shored trench walls at an overall slope of less than 45 degrees

  • Safe means of access/egress provided

  • If ladders are used, do ladders extend at least 1m above edge

  • If ladders are used, are they spaced at regular intervals, corners or intersections

  • Fall restraint/arrest been provided for deep excavations

  • Mechanical ventilation or atmospheric monitoring equipment available and in use for deep excavations or potentially contaminated atmospheres

  • Unattended excavations secured to prevent third party access out of hours

  • Electrical Pole-holder in place where excavations are adjacent to power poles and deeper than 1m.

Equipment

  • Plant specific pre-start inspection completed on powered excavation equipment

  • Powered excavation equipment operating outside limits of approach of existing assets

  • No visible damage to structural members of excavation support

Environment

  • Personnel wearing appropriate hearing protection near operating equipment

  • Noise levels of operational equipment within limits <br>(Please see local council, EPA and local safety authority requirements)

  • Surface water or runoff diverted /controlled to prevent accumulation in the excavation

  • Measures in place to prevent site erosion

  • Plant wash down area established and in use to prevent seed/pathogen spread (P)

  • Oil/Fuel spill response kits and trained personnel onsite

  • Acid Sulphate soil management plan available, understood and implemented

  • Workers aware of Indigenous and European-built cultural heritage issues and response requirements (P)

Vehicle and Plant Compliance

Vehicles

  • Has the daily log book / Pre-start inspection checklist been completed for all vehicles onsite?

  • Has a Risk Assessment been conducted for all vehicles onsite?

  • Are all vehicles in good working order, clean and correctly identified?

  • Are current maintenance records for all vehicles available?

  • Are all Fire Extinguishers tagged and current (inspection regime 6 monthly) and sticker prominently displayed on vehicles?

  • Are first aid kits available with contents in date and sticker prominently displayed on vehicles?

  • Is the vehicle equipped with disinfectant and disposal facilities for contaminated waste including Asbestos Containing Waste Material?

  • Are there no tools or equipment stored on the roof or service body of the vehicle?

Mobile Plant and Equipment

  • Has the daily log book / Pre-start inspection checklist been completed for all plant onsite?

  • Has a Risk Assessment been conducted for all mobile plant onsite?<br>(Stickers on contractor plant and in date)

  • Are all trailers and mobile plant in good working order, clean and correctly identified?

  • Are current maintenance records for all mobile plant available?

  • Does the mobile plant have (1) Flashing Beacon, (2) Reversing Beeper and (3) Seat Belts fitted and used?

  • Are decals indicating crush points prominently displayed on mobile plant (both sides of excavator arm)?

  • Are safety clips on compressor hoses being used?

  • Are all chains and lifting equipment in good condition, tagged and in date?

  • Are all Fire Extinguishers tagged and current (inspection regime 6 monthly) and sticker prominently displayed on mobile plant?

  • Are first aid kits available with contents in date and sticker prominently displayed on mobile plant?

Confined Space Compliance

  • Is confined space entry being undertaken?

  • Is the access/CSE permit system being observed and completed correctly?<br>(Is the Work Order number being used, is there a valid Emergency Contact other than 000?)

  • Is there an emergency rescue plan onsite?

  • Do all members of the CSE team onsite have valid CSE tickets?

  • Are all Harnesses/Lifelines inspected, tagged and in good condition?<br>(Inspection regime is currently 6 monthly)

  • Is the Confined Space Entry procedure onsite and available?

  • Has an exclusion zone been established around the confined space?

  • Are all appropriate control measures in place and protection measures being observed for Fall from Heights risks?

Asbestos Removal Compliance

  • Is Asbestos Cement pipework repair or removal work being undertaken?

  • PVC or disposable rubberised gloves available and worn for all persons handling the Asbestos Cement containing product?

  • Class P2 masks available for all persons on site (min. 2 pairs)

  • Warning signage displayed during any cutting operations?

  • Is appropriate clothing / disposable coveralls (x2 pair) available for work or currently being worn?

  • Are adequate hygiene / washing facilities available for the crew?

  • Sufficient number of Asbestos Waste bags and wide grey tape available for double wrapping of waste material (or has sufficient numbers been used if material already bagged)?

Completion

  • Site Audit Leader Name

  • Site Audit Leader Signature

  • Time Audit Competed

  • Audit Team Members
  • Team Member Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.