Information
-
Document No.
-
Conducted on
-
Prepared by: LLS Logistics on behalf of ISG
Site Information
-
22BG ISG Apple Phase 2
-
ISG Apple PH2
Contractor issuing notice on behalf of ISG
-
LLS Logistics
-
Package reference:
Contractor notice is issued to
-
Company Issued to:
- Integra
- TFA
- MCS
- H&K
- T Clark
- Optima
- TCG
- Kvadrat
- Paragon
Contractual Obligation
-
We remind you of your contractual obligation to keep your work area clear of rubbish, materials ect to ensure safe and sufficient working of this contract. To comply with this obligation you are requested to immediately remove your rubbish ect from the following areas and place it in containers provided
Health & Safety Risk
-
In the event of rubbish, materials ect from the above mentioned contractor poses a health & safety risk area will immediately be cleared by LLS Logistics and the relevant charges will be passed on (Examples of such instances are blocked staircases, blocked fire exit routes ect)
-
Do the items pose an immediate health & safety risk?
Location, photos and details of areas that require improvement
-
Pictures
-
Area
- Basement
- Ground Floor
- Level 1
- Level 2
- Level 3
- Level 4
- Level 5
- Level 6
- Pit Lane
- South elevation court yard
- Level 20
- Level 21
- Level 28
Time frame given to complete improvement notice
-
If you fail to comply with this notice within "selected timeframe below" others will remove it and you will be charged the full cost of the removal operation. ISG/LLS will not be held responsible for any damages caused during the cleanup operation
-
Time Frame
- 1 Hour
- 2 Hours
- 3 Hours
- 4 Hours
- 5 Hours
- 6 hours
- 8 Hours
- 10 Hours
- 20 Hours
- 30 hours
- Close of business
- 24 Hours
- 72 Hours
- 48 Hours
Contra Charge Estimate
-
Time and labour required to complete the "improvement notice" after contractor fail to comply with the issued "improvement notice" (This will be used for the contra charge)
-
Time Required
- 1 Hour
- 2 Hours
- 3 Hours
- 4 Hours
- 5 Hours
- 6 Hours
- 7 Hours
- 8 Hours
- 9 Hours
- 10 Hours
- 20 Hours
- 1.5 Hours
- Close of business
- 30 Hours
- 40 Houra
- 100 Hours
-
Labour Required
- Ganger
- Labourer x 1
- Labourer x 2
- Labourer x 3
- Labourer x 4
- Labourer x 5
- Labourer x 6
- Labourer x 7
- Labourer x 8
- Labourer x 9
- Labourer x 10
- Welfare
- Hoist driver
- Forklift driver
- Carpenter
- Logistics Manager
- Scissor Lift Driver
- Traffic marshal
- 2 x Traffic marshal
Confirtmation of action by LLS
-
Name of Signee