Title Page

  • Monitor Ref

  • ELR & Mileage

  • Description of Works

  • Conducted on

  • Inspected by

  • Location
  • Representative

1. Site Documentation

1. Site Documentation

  • 1.1 WPP & Task Briefing Sheets & Risk Assessments

  • Status

  • 1.2 Briefing Records

  • Status

  • 1.3 Permits (Dig, Hot Works, Height etc.)

  • Status

  • 1.4 F10 Form, HASAWA Notice

  • Status

  • 1.5 Contractors Safety Inspections

  • Status

  • 1.6 Consents / Notifications

  • Status

  • 1.7 COSHH Record of Briefing

  • Status

2. Site Arrangements/ Construction Safety

2. Site Arrangements / Construction Safety

  • 2.1 Scaffold, Access Equipment & Ladders

  • Status

  • 2.2 Protection from Falling Objects

  • Status

  • 2.3 Portable / Power Tools

  • Status

  • 2.4 Lifting Equipment

  • Status

  • 2.5 Mobile Plant

  • Status

  • 2.6 Locating Services

  • Status

  • 2.7 Welfare - Toilets / Washing / Changing

  • Status

  • 2.8 Confined Spaces

  • Status

  • 2.9 Access / Egress / Controls

  • Status

  • 2.10 Tidiness Of Site

  • Status

  • 2.11 Lighting / Working Environment

  • Status

  • 2.12 Site Demarcation / Boundaries

  • Status

  • 2.13 Security of Site / Public Safety

  • Status

  • 2.14 First Aid

  • Status

  • 2.15 Management of Traffic & Pedestrians

  • Status

  • 2.16 Protection of Infrastructure

  • Status

  • 2.17 Emergency / Fire Arrangements

  • Status

3. Contractors Staff

3. Contractors Staff

  • 3.1 Awareness Of Safety Brief

  • Status

  • 3.2 Hazard Awareness

  • Status

  • 3.3 Compliance WPP & Task

  • Status

  • 3.4 Correct Manual Handling

  • Status

  • 3.5 Sentinal Card / TVP

  • Status

  • 3.6 Wearing Task Specific PPE

  • Status

  • 3.7 PPE in Good Order

  • Status

  • 3.8 Aware of Limits of Work

  • Status

  • 3.9 Aware of Accident Reporting

  • Status

  • 3.10 Competency Certification (Non NWR)

  • Status

4. Green Zones/Isolations

4. Green Zones / Isolations

  • 4.1 Complies with WON / GZAM / SSOW

  • Status

  • 4.2 In Accordance with Rule Book

  • Status

  • 4.3 Isolation of Form C

  • Status

  • 4.4 Wearing Railway Safety Badges

  • Status

5. Environment Arrangements

5. Environmental Arrangements

  • 5.1 Noise / Light Intrusion

  • Status

  • 5.2 Fumes / Dust

  • Status

  • 5.3 Water Pollution

  • Status

  • 5.4 Vegetation (Jap Knotweed, etc)

  • Status

  • 5.5 Spillage's (Spill Kits, Crystals etc)

  • Status

  • 5.6 Waste Management

  • Status

  • 5.7 Protected Species and SSSI's

  • Status

  • Note - Any non-conformances (Action Required or Noted) are to be entered on the HSE Corrective Actions Section for action from the Contractor then sent back with actions completed via attachment on email.

    Could you please sign the corrective actions closed out section and return back to me via attachment on email.

6. LNW Civils Asset Management - Corrective Actions

LNW Civils Asset Management - Corrective Actions

  • Monitor Ref

  • Site

  • Date & Time

  • Inspected by

Corrective Actions

  • Please list item numbers with title here

  • Comments

  • Guidance

Corrective Actions Close Out

  • Close outs will not be accepted unless all signatures are present.

    Signatures required for close out.

  • Site Manager

  • Project Manager

  • Network Rail Representative:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.