Title Page
-
'Pre-Start Briefing
-
Site Name
-
Conducted on
-
Prepared by
-
Location
Daily Work Summary
-
What type(s) of work are being performed today? Select all that apply.
- Site Set Up, fencing etc
- Strip out
- Demolition -Hand
- Demolition - Mechanical
- Demolition - High Reach
- Hot Cutting / Burning
- Loading - Scrap
- Loading - Waste
- Asbestos Cement Roof ‘Cut and Lower’
- Asbestos - Non-licensed Other
- Asbestos Cement Roof - ‘Cut and Drop’
- Asbestos -Licensed
- Site Clearance
- Scaffolding
- Excavation
- Cable pulling / stripping
- Crushing
- Demobilising
- Pipe connections - flame welding
- Hot work grinding cutting
- Drain cleaning - sewer work
- Confined space entry
-
Overview of works planned for today
-
Safe Work Method Statement - required for the tasks?
-
Any issues or concerns?
Today's Task Breakdown
-
Break today's work into tasks.. Assess each task for hazards and controls
Work Task
-
Task - What work are you doing?
-
Who is doing this task ?
Final Checks
-
Do you have adequate and appropriate PPE for today's work tasks?
Sign Off
-
Note that all operatives working on site must have signed a valid Risk Assessment / Method Statement for there works.
The purpose of a pre-start briefing is to co-ordinate the works that are happening on site that day and to remind operatives of key risks and controls in place.
Each present team member to sign name and signature acknowledging the above tasks, hazards and controls.
Team Member
-
Name & Signature